Laserfiche WebLink
Preserve at Lino Lakes <br />Development Contract <br />May, 2013 <br />6. Publications <br />7. Park Dedication Fee <br />8. Street Lighting — Install/Operate <br />9. Traffic Signing Improvements <br />10. Boulevard Tree Planting <br />11. Street - Storm Sewer - Pond Maintenance <br />12. Sealcoating Fund <br />13. Aerial Photo Recovery Cost <br />B. If the above escrow amounts are insufficient, the Developer shall make such <br />additional deposits as required by the City. The City shall have a right to reimburse <br />itself from the Escrow upon notice to the Developer, with suitable documentation <br />supporting charge. <br />VI. TRUNK UTILITY & SURFACE WATER MANAGEMENT CHARGES <br />A. Trunk Sewer Unit Charges. The City has established trunk unit charges to <br />uniformly distribute the costs of public trunk sanitary sewer infrastructure. Each <br />individual connection to the sanitary sewer system shall be charged a unit charge <br />per SAC unit (currently at $2,911 per SAC unit). The unit charge shall be based <br />on the procedure outlined in the Metropolitan Environmental Services Service <br />Availability Charge Procedure Manual. Trunk sewer unit charges addressed <br />under this paragraph are in addition to any SAC charges imposed by Metropolitan <br />Council Environmental Services. An estimate of the total charge and the trunk <br />utility credit for developer installed trunk oversizing is specified in Attachment A. <br />B. Trunk Water Unit Charges. The City has established trunk unit charges to <br />uniformly distribute the costs of public trunk water infrastructure. Each <br />individual connection to the water system shall be charged a unit charge per SAC <br />unit (currently at $3,854 per SAC unit). The unit charge shall be based on the <br />procedure outlined in the Metropolitan Environmental Services Service <br />Availability Charge Procedure Manual. An estimate of the total charge and the <br />trunk utility credit for developer installed trunk oversizing is specified in <br />Attachment A. <br />A credit of $12,281 will be applied against the Trunk Water Unit Charge for the <br />dedication of Outlot A to the City for use as a future well site. <br />C. Surface Water Management Area Charges. The City has established a trunk area <br />charge to uniformly distribute the costs of public trunk surface water <br />page 12 <br />