My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2013-105 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2013
>
2013-105 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2014 10:42:35 AM
Creation date
10/3/2014 10:06:49 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
09/23/2013
Council Meeting Type
Regular
Resolution #
13-105
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />B. Improvements off the project site to be installed at the Developer's <br />expense, if any, by the Developer as hereinafter provided are hereinafter <br />referred to as "Off -Site Work ". <br />C. Developer shall enter into a Declaration for Maintenance of Stormwater <br />Facilities. <br />II. ON -SITE WORK. <br />A. On -Site Work. The On -site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on -site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, storm drainage systems, water mains, sanitary sewers, <br />hydrants, curbing, lighting, fencing, fire lanes, sidewalks, trails, outside <br />trash disposal enclosures, exterior building architectural design and <br />building elements, site grading and erosion control measures. <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On -site <br />Work are as follows: <br />Subway Site Performance Agreement 091913.doc page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.