Laserfiche WebLink
• <br />ATTACHMENT B <br />SUMMARY OF IMPROVEMENT COSTS <br />DEVELOPER INSTALLED IMPROVEMENTS <br />PROJECT NAME: Alino Addition <br />APPLICANT: Alino, LLC <br />ITEM NECESSARY IMPROVEMENTS <br />1 SITE GRADING <br />2 EROSION CONTROL <br />3 SITE ENGINEERING & SURVEYING <br />4 LANDSCAPING <br />5 STREETS <br />A. Turn Lanes <br />B. On Site Parking Lot <br />B. Pedestrian Trail <br />6 STORM SEWER CONST. <br />A. Trunk <br />B. Lateral <br />C. Surface Water Mgmt. <br />7 SANITARY SEWER CONST. <br />A. Trunk Unit Charge (REU) <br />S B. Lateral <br />C. Trunk Credit <br />8 WATERMAIN CONST. <br />A. Trunk Unit Charge (REU) <br />B. Lateral <br />C. Trunk Credit <br />BUDGET <br />COST <br />Estimate <br />Estimate <br />Estimate <br />Estimate <br />Estimate <br />Estimate <br />Estimate <br />NOTE <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />Estimate e <br />Estimate e <br />$0.112/sf a <br />$2,911 /unit <br />Estimate <br />Estimate <br />$3,854 /unit <br />Estimate <br />Estimate <br />TOTALS: <br />See Attachment C for security amounts to be posted <br />NOTE: <br />a: Cost by City policy <br />b: Estimated Cost or Budget by City <br />c: Previously Assessed <br />d: Cash Requirement per Agreement with Park Board <br />e: Provided by Developer <br />f: Estimate by Feasibility Study <br />• <br />a <br />e <br />e <br />a <br />e <br />e <br />NUMBER OF REU's: <br />ASSESSED AREA (ac.): <br />PRIVATE <br />IMP. (W) <br />$0 <br />So <br />So <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />3 -7 -2013 <br />1 <br />4.96 <br />PUBLIC FEE <br />IMP. (X) AMOUNT (Z) <br />$0 <br />$0 <br />$0 <br />$24,198 <br />$0 $0 $24,198 <br />