My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/31/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
01/31/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2014 2:41:37 PM
Creation date
10/3/2014 12:45:28 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
01/31/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 1 - 03 <br />STAFF ORIGINATOR: Marty Asieson <br />DATE: Summit Fire Protection <br />TOPIC: Site Plan and Minor Subdivision Application Review <br />BACKGROUND: The site plan for this area was reviewed at the June 28, 2000 <br />Environmental Board Meeting in conjunction with the Marmon Keystone project. <br />Marmon Keystone is an approved project that is currently under construction and <br />is located immediately to the East of the Summit Fire site proposal. Summit Fire <br />is located on what is platted as parcel F. <br />At the June 28,2000 meeting, existing excavated areas-that could serve as <br />infiltration ponds were discussed. Pond 1 is the pond that is on the SW corner of <br />this commercial development area and in the SW corner of this property. <br />Virtually all of the surface water drainage for the Summit site will go to this pond <br />#1. This is exactly what was discussed on June 28th. Project engineer John <br />Johnson has created additional swails to slow and infiltrate the water from this <br />site. Pond 1 will also take the water drainage from 2 acres on the parcel to the <br />north. - <br />As noted from the submitted infiltration checklist sheet, water from roofs will be directed <br />into storm pipes feeding directly into two constructed infiltration basins. Curb and one <br />catch basin in grass area will be directed to infiltration basins. <br />Soil compaction is indicated to be 95% (engineering standard for settlement <br />assurances). I have talked to John Johnson about this and John will write a spec for the <br />vegetation growth areas that would reflect the soils are no higher in density than 1.7 <br />grams per cubic centimeter. This is the limiting soil bulk density for plant growth in fine. <br />sand soils. <br />The landscape plan reflects the standard that seems to be acceptable in the business <br />district. That is, irrigated turf in the front and native materials in the drainage areas. We <br />have in the past asked for a maintenance contract to be signed with a company <br />knowledgeable in native plant culture, for the areas that have these native plant areas. <br />OPTIONS: <br />• Change soil specs in growing areas to reflect less than the 1.7 G /cu cm. <br />• Require native plant maintenance contract. <br />• Require a few native flower gardens in front area. This is consistent with other <br />commercial sites where native flowerbeds have been planned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.