My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/31/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
01/31/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2014 2:41:37 PM
Creation date
10/3/2014 12:45:28 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
01/31/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT NAME: <br />RICE CREEK WATERSHED DISTRICT <br />INFILTRATION WORKSHEET <br />So ne I j naff PRoTTCT IoN PERMIT NO. <br />• <br />STEP 1: Determine impervious and pervious areas. • <br />Note: Include all pervious and impervious areas located in any rights -of -way. <br />(a) Total Site Area 2.O <br />(b) Impervious Area Li. 246 ac (examples: roads, roofs, parking lots, <br />' gravel drives) <br />(c) "Effective Pervious Area 0.15 / ac (not a — b) <br />Undisturbed: 1.95 ac Disturbed: S. ZS 5 ac <br />* Only use horizontal component of surface area which is subject to intermittent <br />prolonged wetting. Do not include area of permanent pools of ponds or <br />wetlands (see Stormwater Infiltration Guidance Design Parameters). <br />Note: The effective arca available for infiltration must be capable of receiving <br />the runoff from impervious surfaces. Pervious "islands" located above <br />adjacent parking lot surfaces, for example, will not be credited. <br />STEP 2: Demonstrate % imperviousness for the site <br />[(b) + (a)] x 100 = 58.5— % (d) (d) MUST BE < 80% <br />STEP 3: Determine runoff volume from impervious surfaces generated by median storm <br />of 0.34 inches. <br />11 "216 (b) <br />0.9 x - 0.34 inches x <br />lft <br />12 inches <br />Impervious Coefficient Mpls -St. Paul Volume <br />Area (ac) Median Storm Needed to be <br />Rainfall Infiltrated (ac ft) <br />0.10 (e) <br />STEP 4: Calculate volume capable of tieing infiltrated on site within 72 hours. Use <br />infiltration rates listed on page 2 of Stormwater Infiltration Guidance Design <br />Parameters. <br />Saturated infiltration rate (if multiple on -site soil types, use most restrictive) for <br />Type $ _ soils = a 2-5 (f) <br />in/hr <br />1 ft 0! (c) x Q 2S 72 0.2-0 <br />12 inches (a) <br />Effective Infiltration <br />Pervious) Rate <br />Area (ac) Corresponding <br />to Soil Type <br />(in/hr) <br />Hours <br />STEP 5: Compare volume generated to volume infiltrated. <br />O. 2.01 (g) MUST BE GREATER THAN OR EQUAL TO 0.10$ <br />Volume <br />Infiltrated <br />in 72 Hours <br />(ac ft) <br />• <br />RECE :yEO <br />e). jP099 till001 <br />CM)'Y OF LI O LAKES <br />
The URL can be used to link to this page
Your browser does not support the video tag.