Laserfiche WebLink
MI GENERAL NOTES <br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WRIT THE <br />GENERAL CONTRACTOR AND. BY CALUNG GOPHER STATE ONE CALL (454 -002) PRIOR TO <br />STAKING PLANT LOCATIONS. <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTAUATIONS WR'H OTHER <br />CONTRACTORS WORKING ON SITE. <br />3. WHERE EXISTING TREES AND /OR SIGNIFICANT SHRUBS MASSINGS ARE FOUND ON SITE, <br />WHETHER SHOWN ON THE DRAWING OR NOT, THEY; SHALL BE PROTECTED AND SAVED <br />UNLESS NOTED TO BE REMOVED AND /OR ARE IN AN AREA TO BE GRADED: ANY QUESTION <br />REGARDING WHETHER PLANT MATERIAL SHOULD REMAIN OR NOT SHAD_ BE BROUGHT TO <br />THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO REMOVAL <br />• <br />4. AU. EXISTING TREES TO REMAIN ARE to BE FERTIU`LED AND PRUNED TO REMOVE DEAD WOOD <br />AND DAMAGED OR RUBBING BRANCHES. <br />5. B&B TREES AND SHRUBS ARE BALLED AND BURLARED. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS 'APPROVAL IS REQUESTED <br />OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE <br />SUBMISSION OF A BID AND /OR QUOTATION. <br />7. ALL PLANT MATERIAL SWILL COMPLY WITH THE LATEST EDITION OF THE AMERICAN <br />STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />8. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED <br />MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE <br />WHICH MAY OCCUR PRIOR TO OWNER, ACCEPTANCE SHALL BE TIE RESPONSIBBILITY OF THE <br />CONTRACTOR. <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE <br />INSPECTION. <br />10. WARRANTY toR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE <br />LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE <br />MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />11. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR • <br />FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO <br />ADDITIONAL COST TO THE OWNER. <br />• DECIDUJOUS FREE <br />NOTE: <br />TWO ALTERNATE METHODS OF • <br />TREE STAKING ARE ILLUSTRATED <br />IT 1S THE OR'S 'OPTION <br />TO STAKE T HOWEVER. THE <br />CONTRACTOR 15 RESPONSIBLE FOR <br />MAINTAINING TREES IN A PLUMB <br />POSITION THROUGHOUT THE <br />QUARANTEE PERIOD. <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE PRIOR TO PLANTING <br />DOUBLE STRAND 14 GA. WIRE - <br />3. 0 120' INTERVALS (TYP.) <br />6" POLYPROPYLENE OR <br />DE STATE E (40 MIL, 1 -1/2' <br />TREE WRAP TO FIRST BRANCH <br />FLAGGING -.ONE PER WIRE <br />ROOTBALL TO SR ON SUBGRADE <br />MULCH - 4' bEEP SHREDDED BARK <br />PLANTING SOIL - SEE SPEC. <br />TOPSOIL <br />SUBGRADE <br />2" X 2" X 24" WOOD STAKE SET <br />AT ANGLE <br />SOD <br />- PLANTING SPECIFICATIONS <br />1. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILLED TO A MINIMUM <br />DEPTH OF 10'. AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION. <br />Z. BACKFILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. <br />REMOVE ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER. <br />5. FERTIUZATION: ALL PLANT MATERIALS SHALL BE FERIIUZED UPON INSTALLATION WITH <br />DRIED BONE MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOIL PER <br />THE MANUFACTURER'S INSTRUCTIONS. <br />• <br />4. MULCH MATERIAL: AS SPECIFIED bN THE LANDSCAPE PLANS: MASS MULCH ALL PLANTING <br />BEDS t0 3' DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO <br />RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER. ALL <br />EVERGREEN AND DECIDUOUS TREES TO RECEIVE 6" DEEP SHREDDED HARbWOOD MULCH <br />WITH NO MULCH IN DIRECT CONTACT WITH TREE TRUNK. <br />• <br />5. TREE S'jAKING: R SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO STAKE AND /OR GUY <br />THE TREES ACCORDING TO THE 'DETAILS. R IS THE CONTRACTOR'S RESPONSIBIUTY TO TAKE <br />EVERY STEP NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB <br />CONDITION AT ALL TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY <br />WHERE VANDALISM, SOIL OR WIND CONDITIONS ARE A PROBLEM. <br />8. TREE WRAPPING: WRAPPING MATERIAL SHALL BE QUALITY. HEAVY WATERPROOF CREPE <br />PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL DEdIDUOUS TREES PLANTED IN THE <br />FALL PRIOR TO 12 -1 AND REMOVE ALL WRAPPING AFTER 5,-1. <br />1. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS • OTHERWISE <br />SPECIFIED. <br />8 PLANTING PLAN: AU. PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE <br />PLANS. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES <br />EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. <br />DO NOT SCALE DRAWINGS. <br />9. EDGING- EDGING SHALL BE 4" P.V.C. COMMERCIAL GRADE EbGING WITH THREE (3) MEAL <br />STAKES PER 20 FOOT SECTION. ALL MASS PLANTING BEDS SHALL HAVE EDGING <br />BETWEEN MULCH AREA AND ANY ADJACENT TURF AREA. <br />CONIFEROUS TREE <br />NOTES: <br />CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS NOTED OTHERWISE. <br />NO MULCH TO BE IN CONTACT WITH TRUNK. <br />SCARIFY BOTTOM AND SIDES, OF HOLE PRIOR TO PLANTING. <br />TWO ALTERNATE METHODS OE TREE STAKING ARE ILLUSTRATED. <br />IT IS THE CONT'RACTOR'S OPTION TO STAKE TREES; HOWEVER. THE CONTRACTOR IS <br />RESPONSIBLE FOR MAINTAINING TREES IN A PLUMB POSITION THROUGHOUT THE <br />GUARANTEE PERIOD. <br />• <br />DOUBLE STRAND 14 GAOVIRE. <br />3' 0 120' INTERVALS (YP.) <br />16" POLYPROPYLENE OR <br />POLYETHYLENE (40 MIL. ) <br />1 -1/2" WIDE STRAP <br />8'-0" STEEL STAKE <br />FLAGGING +- ONE PER WIRE <br />ROOTBALL TO SR ON <br />SUBGRADE <br />MULCH - 4" DEEP <br />SHREDDED BARK <br />PLANTING SOIL - SEE SPEC. <br />TOPSOIL <br />BGRADE <br />2' X 2" X 24" WOOD STAKE <br />SET AT ANGLE <br />SOD <br />Twin Arse U §1 -= .151 -00U1 <br />IAN. toll l ree 1- 566 -- 252 -1166 <br />NI PLANTING NOTES <br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED <br />IN THE IMMEDIATE AREA. <br />2. ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE <br />ARCHITECT PRIOR TO ANY AND ALL DIGGING. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS. <br />SOIL CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT <br />PLANT MATERIAL ESTABLISHMENT. SURVIVAL. OR GUARANTEE, THEY SHALL BRING THESE <br />DEFICIENCIES TO THE ATTENTION. OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS. MAY BE NEEDED IN FIELD. <br />SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED. <br />5. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY <br />NTI <br />IDEFIED (COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL. NOT BE <br />REMOVED PRIOR TO OWNER ACCEPTANCE. <br />7. WHERE SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD /SEED SHALL BE HELD <br />1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB. ETC. <br />8. SOD SHALL BE LAID PARALLEL, TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON <br />SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE <br />GGRROODUND. <br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO <br />RECEIVE SOD. <br />10. REPAIR ALL DAMAGE TO PROPERTY FROM- PLANTING OPERATIONS AT NO COST TO THE <br />OWNER. <br />MI IRRIGATION NOTES <br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SHOP DRAWING <br />ILWSTRATING AN IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK <br />WHEN BIDDING. THESE SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO <br />OR ER. • <br />• <br />2. VERIFY EXISTING /PROPOSED IRRIGATION SYSTEM LOCATION. <br />3. UNLESS OTHERWISE NOTED ALL SW__ /SEED AND PIANTING AREAS INDICATED ON PLAN SHALL <br />BE 100X IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN <br />PROPERTY LINE AND BACK OF CURB WHERE NEW LANDSCAPE IMPROVEMENTS ARE <br />PROPOSED. <br />4. R SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL <br />SODDED /SEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS <br />DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION. <br />5. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH•A WATERING/LAWN <br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDmONNSS AND TO PLANT <br />MATERIAL GROWTH REQUIREMENTS. <br />NM SHRUB <br />11111 =i1ii, .:. = '= 1 {1 {fi =i <br />11_111 III = 111111.= lfllll= 111111 °IIIIII_°IIIIII_ = 111111°1 <br />NOTE: <br />HAND LOOSEN ROOTS OF <br />CONTAINERIZED MATERIAL (TYP.) <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE PRIOR TO PLANTING <br />SHRUBS TO SIT ON SUBGRADE <br />MULCH - 4' DEEP SHREDDED BARK <br />LANDSCAPE FABRIC. - SEE SPEC. <br />PLANTING SOIL - SEE SPEC <br />4' P.V.C. EGGING <br />REFER TO PLAN FOR GROUND <br />COVER <br />SUBGRADE <br />CENTERING OF SHRUB IN BED <br />TO TAKE PRECEDENCE OVER <br />DIMENSION FROM EDGE. <br />RECO <br />JAN 1 2 2001 <br />CITY OF LINO LAKES <br />r, <br />1 <br />1 <br />ity <br />2 <br />5 <br />I <br />a <br />Z <br />O <br />0 <br />z <br />O <br />0. g <br />a <br />Id <br />LANDSCAPE DETAI <br />VN <br />0 <br />