My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/31/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
01/31/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2014 2:41:37 PM
Creation date
10/3/2014 12:45:28 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
01/31/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 2/99 <br />ENVIRONMENTAL ASSESSMENT WORKSHEET <br />Note to preparers: This form is available at www.mnplan.state.mn.us. EAW Guidelines will be <br />available in Spring 1999 at the web site. The Environmental Assessment Worksheet provides information <br />about a project that may have the potential for significant environmental effects. The EAW is prepared by <br />the Responsible Governmental Unit or its agents to determine whether an Environmental Impact Statement <br />should be prepared. The project proposer must supply any reasonably accessible data for — but should not <br />complete — the fmal worksheet. If a complete answer does not fit in the space allotted, attach additional <br />sheets as necessary. The complete question as well as the answer must be included if the EAW is prepared <br />electronically. <br />Note to reviewers: Comments must be submitted to the RGU during the 30 -day comment period following <br />notice of the EAW in the EQB Monitor. Comments should address the accuracy and completeness of <br />information, potential impacts that warrant further investigation and the need for an EIS. <br />1. Project title <br />2. Proposer 3. RGU <br />Contact person Contact person <br />Title Title <br />Address Address <br />City, state, ZIP City, state, ZIP <br />Phone Phone <br />Fax Fax <br />E -mail E -mail <br />4. Reason for EAW preparation (check one) <br />EIS scoping Mandatory EAW <br />Proposer volunteered <br />Citizen petition RGU discretion <br />If EAW or EIS is mandatory give EQB rule category subpart number and subpart name <br />5. Project location County City/Township <br />�A Section <br />Township Range <br />Attach each of the following to the EAW: <br />• County map showing the general location of the project; <br />• U.S. Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries <br />(photocopy acceptable); <br />• Site plan showing all significant project and natural features. <br />6. Description <br />a. Provide a project summary of 50 words or less to be published in the EQB Monitor. <br />b. Give a complete description of the proposed project and related new construction. Attach additional <br />sheets as necessary. Emphasize construction, operation methods and features that will cause physical <br />manipulation of the environment or will produce wastes. Include modifications to existing equipment or <br />industrial processes and significant demolition, removal or remodeling of existing structures. Indicate <br />the timing and duration of construction activities. <br />c. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need <br />for the project and identify its beneficiaries. <br />
The URL can be used to link to this page
Your browser does not support the video tag.