Laserfiche WebLink
• <br />• <br />• <br />preparation of the ACD 10- 22 -32, 47, and 25 repair reports. This modeling estimate is <br />based on the assumption that the SWAT model currently being developed as part of the <br />Peltier /Centerville TMDL will be used for the inputs into the Chain of Lakes TMDL and <br />that XPSWMM modeling results will be utilized for the direct drainage areas. <br />This task also includes Lino Lakes RMP classification of wetlands and final <br />determination of wetland mitigation activities for permitting. <br />Task 3 Description <br />Estimated Hours <br />Official Profile <br />550 <br />Ditch Repair Reports <br />430 <br />Subwatershed Delineations <br />28 <br />Create model network & QA/QC <br />236 <br />Data Input- Flow Path, Hydr. Parameters <br />232 <br />Existing Model Debugging <br />28 <br />Existing Model Calibration <br />54 <br />Proposed Model Data Input <br />170 <br />Proposed Model Debugging <br />20 <br />WFA / Classification of Wetlands <br />84 <br />Wetland Permitting Requirements <br />64 <br />Total Hours: 1896 <br />Estimated Budget: $170,640 <br />RCWD Lino Lakes RMP Work Plan Page 7 of 10 <br />1/2/2007 <br />