Laserfiche WebLink
ESTIMATE NO. 3 FINAL <br />06 BIRCH STREET TRAIL <br />TY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 13633.003 <br />ITEM <br />NO. DESCRIPTION <br />PERIOD ENDING: November 30, 2006 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />2006 BIRCH STREET TRAIL <br />1 MOBILIZATION LS 1.0 1.0 $ 7,000.00 $ 7,000.00 <br />2 REMOVE (MILL) BITUMINOUS SURFACING (2' WIDTH) LF 250.0 103.0 $ 10.00 $ 1,030.00 <br />3 REMOVE EXISTING 15" CMP CULVERT LS 1.0 1.0 $ 330.00 $ 330.00 <br />4 REMOVE AND REINSTALL SALVAGED SIGNS EA 4.0 4.0 $ 200.00 $ 800.00 <br />5 COMMON EXCAVATION (P) CY 720.0 720.0 $ 14.00 $ 10,080.00 <br />6 SUBGRADE EXCAVATION CY 150.0 150.0 $ 14.00 $ 2,100.00 <br />7 SELECT GRANULAR BORROW (CV) CY 300.0 290.0 $ 12.50 $ 3,625.00 <br />8 IMPORTED TOPSOIL BORROW (LV) CY 665.0 572.0 $ 16.00 $ 9,152.00 <br />9 AGGREGATE BASE, CLASS 5 FOR TRAIUDRIVEWAY (100% <br />CRUSHED) TN 1,160.0 881.4 $ 17.00 $ 14,983.80 <br />10 TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIUDRIVEWAY TN 260.0 230.2 $ 68.00 $ 15,653.60 <br />11 MODULAR BLOCK RETAINING WALL SF 500.0 130.0 $ 29.00 $ 3,770.00 <br />12 15" RC PIPE APRON EA 2.0 2.0 $ 560.00 $ 1,120.00 <br />13 18" RC PIPE APRON EA 1.0 1.0 $ 630.00 $ 630.00 <br />14 18" CS METAL APRON EA 1.0 1.0 $ 350.00 $ 350.00 <br />15 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 12.0 16.0 $ 69.00 $ 1,104.00 <br />16 18" RC PIPE SEWER, DESIGN 3006 CLASS V LF 16.0 32.0 $ 72.00 $ 2,304.00 <br />17 18" CS PIPE SEWER LF 85.0 146.0 $ 30.00 $ 4,380.00 <br />18 CONSTRUCT MANHOLE, TYPE 403 EA 1.0 1.0 $ 2,200.00 $ 2,200.00 <br />1 *ADJUST FRAME AND RING CASTING (CB OR MH) EA 1.0 $ 550.00 $ <br />ADJUST GATE VALVE BOX EA 2.0 7.0 $ 300.00 $ 2,100.00 <br />21 RANDOM RIPRAP CLASS III CY 10.0 10.0 $ 65.00 $ 650.00 <br />22 4" CONCRETE WALK (PED RAMPS) SF 510.0 315.0 $ 9.00 $ 2,835.00 <br />23 TRUNCATED DOME (PED RAMPS) SF 80.0 40.0 $ 45.00 $ 1,800.00 <br />24 REMOVE AND REINSTALL EXISTING CHAIN LINK FENCE LS 1.0 1.0 $ 700.00 $ 700.00 <br />25 6' CHAIN LINK FENCE LF 50.0 50.0 $ 45.00 $ 2,250.00 <br />26 FURNISH AND INSTALL REMOVABLE BOLLARD EA 1.0 1.0 $ 800.00 $ 800.00 <br />27 TRAFFIC CONTROL LS 1.0 1.0 $ 1,800.00 $ 1,800.00 <br />28 ZEBRA CROSSWALK WHITE, PAINT SF 270.0 300.0 $ 3.00 $ 900.00 <br />29 SILT FENCE, TYPE PREASSEMBLED LF 1,300.0 1,300.0 $ 2.50 $ 3,250.00 <br />30 HAY BALE DITCH CHECK LF 150.0 150.0 $ 4.00 $ 600.00 <br />31 SODDING TYPE SALT RESISTANT SY 6,000.0 6,480.0 $ 2.80 $ 18,144.00 <br />32 TRENCH FRAME W/ GRATED COVER (R- 4996 -A1) LF 24.0 24.0 $ 410.00 $ 9,840.00 <br />33 4" D.I.P. CLASS 52 (STORM SEWER) LF 40.0 34.0 $ 32.00 $ 1,088.00 <br />34 CONNECT TO EXIST. 12" RC PIPE EA 3.0 3.0 $ 330.00 $ 990.00 <br />35 BERM GRADING LS 1.0 1.0 $ 2,005.00 $ 2,005.00 <br />TOTAL ESTIMATE NO. 3 FINAL $ 130,364.40 <br />• <br />