Laserfiche WebLink
• <br />• <br />• <br />Pine Glen — Phase II <br />Development Contract <br />March 12, 2007 <br />1. Grading and Erosion Control Construction & Maintenance <br />a) Erosion and siltation control measures shall be coordinated with the <br />different stages of development. The Developer shall attain an <br />NPDES Stormwater Permit prior to engaging in any site grading <br />activities. All terms and conditions of the NPDES permit must be <br />adhered to by the Developer throughout construction the duration of <br />construction of the Subdivision from start to finish. <br />b) Where the topsoil is removed, sufficient arable soil shall be set aside <br />for respreading over the developed area. The topsoil shall be <br />restored to a depth of at least four (4) inches and shall be of a quality <br />at least equal to the soil quality prior to development. The Developer <br />shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />c) The Developer shall install four (4) inches of topsoil on all <br />boulevards and seed or sod as approved by the City. The Developer <br />shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />d) All disturbed areas shall be sodded or seeded, as designated per the <br />approved plans, immediately upon completion of grading . <br />e) All streets shall be protected from erosion deposits. This should <br />include a combination of roadside silt fences, roadside sod strips, <br />catch basin rock bale inlet protection, rock construction entrances, <br />straw mulch, and/or street sweeping. <br />f) No soils shall be imported or exported without City approval. <br />g) <br />All site grading shall be performed in accordance with the <br />requirements of the Rice Creek Watershed District. <br />h) Existing wells and on -site septic systems shall be properly <br />abandoned. <br />2. Final access drive and driveway grading, subbase, gravel base, bituminous <br />binder course, and concrete curb and gutter shall be furnished and installed. <br />3. The Developer shall place iron monuments at all lot and block corners and at <br />all other angle points on boundary lines. Iron monuments shall be placed <br />after all street and lawn grading has been completed in order to preserve the <br />lot markers for future property owners. Lot corner irons on the back <br />property line shall be installed so that the top of the iron corresponds to the <br />page 3 <br />