My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-041 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-041 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 3:06:32 PM
Creation date
10/7/2014 8:45:42 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/12/2007
Council Meeting Type
Regular
Resolution #
07-041
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IP <br />• <br />• <br />Holiday Stationstore Page 3 March 2, 2007 <br />Drainage Calculation Review <br />City of Lino Lakes, Minnesota <br />11. Include notes on the grading plan incorporating the following: 1) the proposed infiltration area should <br />be staked off and marked during construction to prevent heavy equipment from compacting the soil, <br />2) the infiltration area should not be excavated to final grade until the contributing drainage areas <br />have been constructed and fully stabilized, and 3) final excavation of the infiltration areas should be <br />completed using light tracked equipment to avoid compacting the basin floor. <br />2/14/07 This item has been addressed. <br />12. To provide a well aerated, highly porous surface, the soils of the infiltration basin floor should be <br />loosened to a depth of at least 12 inches prior to planting. <br />2/14/07 This item has been addressed. <br />13. Indicate the type and location of vegetation used in the ponding areas. It is highly recommended that <br />mature plants be used over seed in the infiltration basin. Fluctuating water levels following seeding <br />can cause seed to float and be transported downstream of the infiltration basin. In addition, it may <br />take up to two growing seasons to establish the function and aesthetic value of mature vegetation <br />using seeds. <br />2/14/07 This item has been addressed. <br />14. The MPCA NPDES Permit requires that the design storm runoff volume in the proposed infiltration <br />basin infiltrate within 48 hours. <br />15. Submit a geotechnical report for review. The lowest floor elevation is required to be 4 feet above the <br />seasonal high ground water elevation. <br />2/14/07 Submit a geotechnical report for review when available. <br />16. Runoff from the site discharges to the Interstate Highway 35W right -of -way; therefore, permit <br />approval from Mn/DOT may be required. <br />17. Submit a copy of the NPDES permit for the City's records when available. <br />18. Approval from Rice Creek Watershed District (RCWD) is required. Submit a copy of the RCWD <br />Permit when available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.