• <br />• <br />90794 <br />desirable to cause the contract construction to be in all things <br />performed and completed in a satisfactory manner. All change orders <br />and supplemental agreements required to implement such changes to the <br />contract construction shall be negotiated and prepared by the State's <br />engineer and submitted to the City for execution in accordance with <br />Article I, Section F. of this Agreement. <br />Section B. Partial and Final Estimates of Construction <br />At regular intervals during the contract construction, the State <br />shall prepare and certify partial cost estimates for completed <br />contract construction in accordance with the terms of the <br />construction contract. The State shall also prepare the final <br />estimate data for the contract construction. Immediately after the <br />preparation of each partial and final estimate, the State shall <br />submit the estimate to the City. Quantities listed on the partial <br />and final estimates shall be documented in accordance with the <br />guidelines set forth in the applicable documentation manual. The <br />City shall make all payments to the contractor for completed <br />certified contract construction. <br />ARTICLE III - PAYMENT BY THE STATE <br />The State shall advance to the City, as the State's full and complete <br />share of the costs of the roadway, bridge, and signal construction to <br />be performed upon, along and adjacent to Trunk Highway No. 35W at the <br />Lake Drive Interchange within the corporate City limits under State <br />Project No. 0280 -55 (T.H. 35W =394), a lump sum in the amount of <br />$576,000.00. <br />The State shall advance to the City the lump sum amount after the <br />following conditions have been met: <br />A. Encumbrance by the State of the State's full and complete lump <br />sum cost share. <br />6 <br />80/90'd ST:2T 2,00Z- TZ -ddW <br />