My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-083 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-083 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2014 12:07:11 PM
Creation date
10/8/2014 8:28:59 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
07/23/2007
Council Meeting Type
Regular
Resolution #
07-083
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Development Contract — Site Grading Only <br />The Preserve <br />July 23, 2007 <br />13. All construction activity shall be limited to the hours set as follows: <br />Monday through Friday 8:00 a.m. to 4:30 p.m. <br />Saturday 9:00 a.m. to 4:30 p.m <br />Sunday and Holidays No working hours allowed <br />14. Reimburse the City for the cost of periodic inspections by the City for the <br />purpose of determining that the terms under which the permit has been <br />issued are being complied with. <br />15. Post a form of security to the City, conditioned to pay the City the cost and <br />expense of repairing or cleaning any highways, streets, or other public <br />ways within the City made necessary by the special burden resulting from <br />transporting thereon by the applicant material to or from the site, the <br />amount of such cost to be determined by the Council; and conditioned <br />further to comply with all the requirements of this Ordinance and the <br />particular permit, and to save the City free and harmless from all suits or <br />claims for damages resulting from the negligent excavation, removal, <br />storage, or filling of rock, sand, dirt, gravel, clay, or other like material <br />within the City. <br />16. Permits from the Rice Creek Watershed District must be submitted to the <br />City prior to any activity. All activities on the site must comply with the <br />Rice Creek Watershed District requirements. <br />17. All excavation, erosion and sedimentation control, final site grading, and <br />restoration shall be completed by November 1, 2007. <br />18. The City will monitor traffic and hauling activities and have any necessary <br />adjustments made at the contractor's expense. <br />19. Trucks will be limited to a maximum speed of 20 mph on City Streets. <br />20. Wood chips will be placed on the haul route in the turf areas of Birch Park. <br />21. Any damaged irrigation will be replaced at the developer's expense. <br />22. Snow fence will be installed along both sides of the haul route through <br />Birch Park. <br />23. The haul route through Birch Park will have the topsoil replaced and hydro <br />• seeded at the developer's expense. <br />page 13 <br />-144- <br />
The URL can be used to link to this page
Your browser does not support the video tag.