Laserfiche WebLink
Council Meeting <br />Janua y 25; 1982 <br />A recess was called at 8:55 P.M. The meeting reconvened at 9:04 P.M. <br />IIPUBLIC HEARING - RESHANAU SHORES PLAT <br />137 <br />This land is being subdivided by Mr. George Gotwald. He presented Mr. Jim <br />Kurth, Land Surveyor, who presented the plat to the Council This land is <br />divided into 11 - 1 full acre lots on either side of 7th Avenue. Mr. Kurth <br />pointed out that Outlot A could possibly be developed in the future when <br />sanitary sewers are available and Outlot B is a marsh area. All buildings <br />sites will be 11/2 feet above the street and the septic systems will be 8' <br />above the normal water level and conform to the rules and regulations of <br />WPC -40. <br />Mr. Gotwald pointed out that the normal level of the lake is 879.6 and in <br />1965, the level was at 884.9. This was an all time high and the 100 year <br />storm level is computed at 885.2. The lowest elevation on any lot in the <br />plat is 888.0 and these would need to be filled to bring the building site <br />to 12' above the street. <br />Mr. Benson asked about the Spring snow melt and Mr. Gotwald explained that <br />the 100 year storm predictions takes all this into consideration. <br />There were questions on the septic systems and Mr. Gotwald pointed out that <br />all systems will be in front of the homes on the street side. Mr. Gotwald <br />told the Council that this plat conforms to the Lake Shore Management Act <br />even though the City has not adopted the Act. <br />I Mayor Benson asked Mr. Doocy, of the Planning and Zoning Board, if there had <br />been any questions they had problems with and Mr, Doocy said, No. <br />Mr. Schumacher asked if this had been presented to the Rice Creek Watershed <br />Board and Mr. Gotwald said, No, this Board will not consider a plat until <br />it is approved by the local Council. This will be presented to them for <br />their comment before the final plat is prepared. <br />Mr. Schumacher reminded the Council that the Park dedication has been taken <br />care of in the lands that were received in conjunction with the entire Lakes <br />Project. <br />Mr. Gotwald told the Council that at the present time there is only the <br />driving surface of the street in that area - there is no dedicated right - <br />of -way - this plat will insure the proper width of 7th Avenue it's entire <br />length. <br />Mr. Marier moved to approve the preliminary plat of Reshanau Shores as <br />presented. Seconded by Mr. Kulaszewicz. Motion carried unanimously. <br />Mayor Benson closed the public hearing at 9:25 P.M. <br />BUILDING INSPECTOR - STATUS OF DuFOUR TRAILER PERMIT <br />Mr. Kluegel explained that this permit had been issued on a temporary basis <br />to allow Mr. DuFour to construct a home. He reported the foundation to <br />the home is in and backfilled. There has been a well drilled and a septic <br />system installed that is not complete at this point in time. Mr. Kluegel <br />said the last 90 day permit has expired and he would like some direction <br />from this Council as to a time frame. <br />