My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/1983 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1983
>
07/11/1983 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 1:23:25 PM
Creation date
10/10/2014 9:28:36 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
07/11/1983
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />69 <br />July 11, 1983 <br />Mr. Marier asked about Lot 8, it is only 74.8 feet - felt this should <br />be checked. <br />Mr. Reinert asked Mr. Short's position on this rezoning. Mr. Kluegel <br />reported that Mr.Short had reported it is consistent with the Comp <br />Plan, and is a down zoning from the proposed usage. <br />Mr. Ross asked about the sewer and water for this project and Mr. Davidson <br />reported he has received this and there are several alternatives. He <br />reported his recommendation is to have the sewer line broght to the <br />West boundary of the City and this project will be connected to that <br />line and a separate water system for that part of the City. There is <br />also both utilities in Circle Pines but he felt this would less <br />desirable. <br />Mr. Reinert aksed Mr. Hawkins if it was possible to put a revision on <br />this rezone if this priject does not proceed. Mr. Hawkins felt this is <br />a possibility. Mr. Hawkins pointed out that there is not a R7 zoning <br />in the City until the new Zoning Ordinance becomes effective. <br />Mr. Reinert moved to close the public hearing. Seconded by Mr. <br />Kulaszewicz. Motion carried unanimously. <br />Mr. Reinert moved to approve this rezonig with the stipulation that this <br />zoning is effective August 11, 1983 and contingent upon the adoption of <br />the new zoning ordinance, further that this zoning be contingent upon <br />a written agreement by the owner that this pronect will be completed as <br />propsoed within a period of time to be determined by the Council or the <br />land will revert to the zoning propsoed on the Zoning District Map as <br />R3. Mr. Reinert noted the reasons for this approval in that this is <br />consistent with the Comp Plan and the Zoning Map. Seconded by Mr. <br />Kulaszewicz. Motion carried unanimously. <br />A recess was called at this point in the meeting. The meeting reconvened. <br />REMOVAL OF HAZARDOUS BUILDINGS <br />Mr. Kluegel explained that the building located across from the Village <br />Plumbery are haszardous and should be removed. These buildings are <br />owned by Mr. Menkveld and constitute a fire hazardous and a threat to <br />public safety. There are no occupants and are not secure. <br />Mr. Hawkins reported that he had sent the sample forms out and recommended <br />that the specific reasons be noted for the removal of the buildings. <br />Mr. Reinert moved to table this item and put on the July 2, 1983 agenda. <br />Mr. Hawkins noted that this is a matter that is handles by District <br />Court and there is a specific procedure. <br />The motion was seconded by Mr. Kulaszewicz. Motion carried unanimously. <br />ENGINEER's REPORT <br />Mr. Davidson presented the plans ans specifications for the installation <br />of the Baldwin Lake Sewer noting that they are the same as the plans that <br />were presented at the Public Hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.