My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/25/1984 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1984
>
06/25/1984 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 1:22:51 PM
Creation date
10/10/2014 12:25:37 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
06/25/1984
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
246 <br />June 25, 1984 <br />OPEN MIKE <br />Mrs. Diane Maus who lives in MarDon Acres appeared to question the <br />Council on the possibility of fencing a drainage ditch that runs in <br />the back of her home. She was concerned with small children falling <br />into that ditch. <br />Mayor Benson pointed out this is not the policy of the City to fence <br />the drainage areas or the holding ponds in the developments. However, <br />he suggested perhaps Mr. Volk could take a look at this and maybe pump <br />some of the water. <br />Mrs. Maus also asked if the City of Lino Lakes has warning sirens and <br />was told, not at this time. However, Mr. Cape, the Civil Defence Di- <br />rector, is preparing a study on this subject. <br />ENGINEER'S REPORT <br />Mr. Davidson presented a feasibility report on the consideration of <br />water and sewer for the residents along Ash Street in conjunction with <br />a system being installed by Shoreview. <br />Mr. Davidson reported that the cost figures had been taken from the <br />Shoreview feasibility report. Mr. Davidson said, due to the isola- <br />tion of this area, he had considered this corner of the City as a <br />sewer and water district of its own. His report was based on the <br />consideration of this area. <br />Mayor Benson asked about the residents along that area that were in- <br />terested in this projection and Mr. Schumacher said, yes and those <br />persons had been notified of this meeting. <br />There was discussion on the undeveloped area with Mr. Davidson noting <br />that further studies would need to be done if this area is included. <br />Mayor Benson asked about just considering the persons along Ash Street <br />and Mr. Davidson felt the cost would be higher. <br />Mr. Schumacher noted that the Public Hearing on this project has <br />been set by the City of Shoreview and will be held within the next <br />couple of weeks. <br />Mayor Benson felt this Council must see if there is an interest in <br />this by the residents and then set a public hearing on the issue. <br />Mr. Marier moved to find out what is cheapest. Seconded by Mr. <br />Kulaszewicz. Motion carried unanimously. <br />PUBLIC HEARING - REZONING - BASTIEN <br />Mayor Benson opened this Public Hearing at 7:37 P.M. and asked Mr. <br />Kluegel to present this item. <br />Mr. Kluegel noted this is approximatelya 40 -acre parcel to be rezoned <br />from a R3 to GB. The current zoning restricts the expansion of <br />the Bastien Products. Mr. Kluegel noted that all other property <br />owners in this area had signed a petition requesting this rezoning. <br />The area to be considered was pointed out on the map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.