Laserfiche WebLink
1'12 <br />COUNCIL MEETING <br />September 23, 1985 <br />Page Ten <br />runs to Lake Reshanau. He had held a neighborhood meeting with <br />some of the present home owners and he explained his development <br />to them and received a good response from them. <br />Mr. Uhde explained the function of the home owners association and <br />explained that each lot owner would pay a fee to maintain the pond. <br />The home owners agreement states that if a lot owner did not pay <br />his portion of the pond maintenance it would be assessed to his <br />property. The approximate cost to each homeowner would be approxi- <br />mately $1,200 per year. <br />1 <br />Mr. Robert Bening was concerned about the drainage through the cul- <br />vert. This is not on Mr. Uhde's property, how will it be maintained. <br />He will have to work with the owner of the south half of Outlot F <br />so that the swale can be constructed and maintained. <br />Al Ross asked what size culvert will be used for this drainage. <br />Mr. Uhde explained the culvert is already in place and is 18" in <br />diameter. The City Engineer will be involved with inspection of <br />this construction. <br />Mrs. Donna Carlson asked what provision is being made so that she <br />will not have the pond in her back yard? Mr. Uhde explained the <br />pond will have to raise four feet to get to her property line. <br />However, once the pond raises six inches it will begin to flow <br />through the swale to Lake Reshanau. <br />Mr. Uhde pointed out that he has obtained a permit from Rice Creek <br />Watershed District and his engineers had to work out extensive_ <br />storm water drainage requirements for approval by the RCWD engi- <br />neers. <br />Mayor Benson asked what would happen if the Lake waters rose to <br />such an elevation that the culvert would not drain. Mr. Uhde ex- <br />plained the lake would have to raise two feet. <br />Mr. Harold Carlson asked about sediment in the pond. Mr. Uhde <br />explained the only time there would be sedimentation is during <br />actual construction. He expects the project to be 50% to 70% com- <br />pleted in two years. Mr. Uhde explained that Mr. Carlson did not <br />have to join the homeowners association unless he wanted to. <br />Jim Wagner was concerned about the swale and drainage to the cul- <br />vert. Trees have been planted in this area and he is concerned <br />they may be removed. However his main concern is that the drain <br />does function and someone is responsible to see that it does. Mr <br />Uhde said he will work with the present homeowners very closely. <br />He will protect the trees and will do some grade changes to their <br />back yards at no cost to them if they so want. He would like to <br />control the groundwater in the entire area. <br />1 <br />1 <br />