My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-087 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-087 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:45:13 PM
Creation date
10/14/2014 12:04:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
07/23/2007
Council Meeting Type
Regular
Resolution #
07-087
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIT CUP—Materials Storage (6497 12t'Avenue South) <br /> Page 6 of 7 <br /> 10. A rock trench entrance shall be installed and maintained at all <br /> times. <br /> 11. Dust and wind erosion must be confined to the site and be <br /> controlled by watering the driveway as necessary. <br /> 12. Street sweeping shall occur as necessary. <br /> 13. All construction activity shall be limited to the hours set as follows: <br /> Monday through Friday 8:00 a.m. to 4:30 p.m. <br /> Saturday 9:00 a.m. to 4:30 p.m <br /> Sunday and Holidays No working hours allowed <br /> 14. Reimburse the City for the cost of periodic inspections by the City <br /> for the purpose of determining that the terms under which the <br /> permit has been issued are being complied with. <br /> 15. Post a form of security to the City, conditioned to pay the City the <br /> cost and expense of repairing or cleaning any highways, streets, or <br /> other public ways within the City made necessary by the special <br /> burden resulting from transporting thereon by the applicant material <br /> to or from the site, the amount of such cost to be determined by the <br /> Council; and conditioned further to comply with all the requirements <br /> of this Ordinance and the particular permit, and to save the City <br /> free and harmless from all suits or claims for damages resulting <br /> from the negligent excavation, removal, storage, or filling of rock, <br /> sand, dirt, gravel, clay, or other like material within the City. <br /> 16. Permits from the Rice Creek Watershed District must be submitted <br /> to the City prior to any activity. All activities on the site must comply <br /> with the Rice Creek Watershed District requirements. <br /> 17. All excavation, erosion and sedimentation control, final site grading, <br /> and restoration shall be completed by November 1, 2007. <br /> 18. The City will monitor traffic and hauling activities and have any <br /> necessary adjustments made at the contractor's expense. <br /> 19. Trucks will be limited to a maximum speed of 20 mph on City <br /> Streets. <br /> 20. Wood chips will be placed on the haul route in the turf areas of <br /> • Birch Park. <br /> 21. Any damaged irrigation will be replaced at the developer's expense. <br /> - 117- <br />
The URL can be used to link to this page
Your browser does not support the video tag.