My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-102 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-102 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2014 10:46:26 AM
Creation date
10/15/2014 8:46:44 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
07/09/2007
Council Meeting Type
Regular
Resolution #
07-102
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Anoka County Contract No.2006 -0560 <br />III. COSTS <br />A. CONSTRUCTION <br />The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, <br />normal engineering costs, design costs for city utilities and equipment rental required to complete <br />the work, shall constitute the actual "construction costs" and shall be so referred to herein. <br />"Estimated costs" are good faith projections of the costs, which will be incurred for this project. <br />Actual costs may vary and those will be the costs for which the relevant parties will be responsible. <br />The estimated construction cost of the total project is $1,414,769.65. Participation in the <br />construction cost is as follows: <br />1. The City shall provide construction observation for the relocation and <br />reconstruction of their utilities and approve for acceptance the work as it is completed. <br />2. The City shall pay one hundred percent (100 %) of the hydrant and curb box <br />relocation and gate box adjustment as well as water and sewer relocation and construction. The <br />estimated City cost of these items is $130,128.00. <br />3. The City shall furnish and deliver to the site replacement hydrants for any <br />hydrants, which are being relocated as a part of this project, which they want replaced. <br />4. The County shall pay for all remaining construction costs. <br />The total estimated construction cost to the City for the project is $130,128.00 as shown on <br />the attached Exhibit A. The City participation in construction engineering will be at a rate of eight <br />percent (8 %) of their designated share. The estimated cost to the City for construction engineering <br />is $10,410.24. The grand total estimated construction cost to the City for the project is <br />$140,538.24. <br />Upon award of the contract, the City shall pay to the County, upon written demand by the <br />County, ninety -five percent (95 %) of its portion of the construction costs payment estimate which is <br />$133,511.32. The City's share of the cost of the project shall include only construction and <br />construction engineering expense and does not include administrative expenses incurred by the <br />County. <br />Upon final completion of the project, the City's share of the construction cost will be based upon <br />actual construction costs. If necessary, adjustments to the initial ninety five percent (95 %) charged <br />will be made in the form of credit or additional charges to the City's share. Also, the remaining five <br />percent (5 %) of the City's portion of the construction costs shall be paid. <br />B. DESIGN <br />The City shall be responsible for all design costs for the relocation of its watermain. The total <br />estimated cost to the City for design is $12,957.62. <br />Upon award of the contract, the City shall pay to the County, upon written demand by the County, <br />shall pay one - hundred percent (100 %) of its portion of design costs for the relocation of its <br />watermain <br />2 <br />