My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-112 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-112 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:45:28 PM
Creation date
10/15/2014 9:47:29 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
08/13/2007
Council Meeting Type
Regular
Resolution #
07-112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract— Site Grading Only <br /> Grandview <br /> August 13, 2007 <br /> V. REIMBURSEMENT OF COSTS <br /> A. The Developer agrees to establish a non-interest bearing escrow account with the <br /> City in an amount determined by the City Administrator or his designee for the <br /> payment of all costs incurred by the City related to the development of the plat and <br /> the Developer Improvements including, but not limited to, the following (See <br /> attachment B for Breakdown of costs): <br /> 1. Plat Review Fee <br /> 2. Planner Review Fee <br /> 3. Administration- 3% Construction Cost <br /> 4. Engineering <br /> a) Administration <br /> 5. Legal -Plat Review <br /> 6. Publications <br /> B. If the above escrow amounts are insufficient, the developer shall make such <br /> additional deposits as required by the City. The City shall have a right to <br /> reimburse itself from the Escrow. <br /> VI. BUILDING PERMITS <br /> A. The Developer agrees that building permits may be issued upon approval of the <br /> Final Plat by the City Council at which time all required Financial Security shall be <br /> in place with the City. The Developer further agrees that City Sewer, Water, Storm <br /> Sewer,and Bituminous Base Construction of the Streets,temporary street signs, gas, <br /> electric, and telephone will be completed prior to the issuance of building permits. <br /> B. The Developer shall submit an as-built survey certifying that all the grading <br /> complies with the grading plan prior to issuance of building permits. <br /> C. Model Homes <br /> The City agrees that one structure per ten(10)acres(1 home)can be installed as <br /> model homes upon approval of the Development Contract(Site Grading Only). The <br /> right to obtain such building permits shall be contingent upon the following: <br /> 1. Execution of this development contract,providing a Letter of Credit in the <br /> amount of$100,000.00 and an escrow amount of$10,000.00. <br /> 2. Construction shall be limited to maintain a minimum distance of 150' from <br /> the furthest exterior wall to an improved gravel street as per the State Fire <br /> rCode. The Developer may construct and maintain such access in order to <br /> meet said requirements. <br /> page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.