My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-118 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-118 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2014 10:54:16 AM
Creation date
10/15/2014 10:42:21 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
08/13/2007
Council Meeting Type
Regular
Resolution #
07-118
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/27/2007 14:05 FAX 6514064724 MN DOT /MENDOTA HTS 1J002 <br />Mn /DOT TP -2460- 0112 -92) <br />• <br />SHEET 1 OF 1 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 1 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />While working along the southeast corner of the existing bridge, it was discovered that a drainage structure is badly <br />deteriorated and undermining a portion of the inplace roadway. In order to prevent further undermining and to control <br />erosion along the roadway and sheetpiling that has been installed it has been determined that the drainage structure should <br />be patched and a temporary pipe installed. <br />This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to patch and provide <br />temporary drainage from the structure located near the southeast corner of the existing bridge. <br />All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT Standard <br />Specifications, Mn/DOT Standard Plates and as directed by the Engineer. <br />•ayment to the Contractor for this work will be via Mn/DOT 1904 Force Account, as shown below in the Estimate of <br />Cost: <br />ESTIMATE OF COST <br />Description <br />GRAND TOTAL FORCE ACCOUNT <br />CHANGE IN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days <br />Is decreased ( ) by Working Days <br />Is increased ( ) by Calendar Days <br />Is decreased ( ) by Calendar Days <br />b. Is not changed (X ) <br />c. May be revised if the work affected <br />the controlling operation ( ) <br />Issued By: <br />Mt/Resident/County Engineer <br />Amount <br />$2,000.00 <br />Date <br />Approved By: <br />Date <br />City of Lino Lakes <br />Approved By: <br />Date <br />Anoka County <br />Accepted By: <br />Contractor's Authorized Representative Date <br />Original to 'Project Engineer; copies to Contractor, City of Lino Lakes, Anoka. County <br />
The URL can be used to link to this page
Your browser does not support the video tag.