My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
07-14-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 2:25:05 PM
Creation date
10/16/2014 1:09:02 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
07/14/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. PERSONNEL <br />Our Team for your project consists of an experienced group of Architects, Public Safety Designer, <br />Engineers, Landscape Architect and Cost Consultant specifically selected for their knowledge <br />of fire station projects and past experience working together as a team. It is our intention to <br />maintain a consistent team of the principal architect and engineers presented in this proposal <br />from the first meeting through completion of the building. By doing this, we will provide continuity <br />of information, communications and understanding of the City's goals as the project progresses. <br />This team will be supported by staff architects, engineers, designers and technicians. The <br />staffing quantities will be regularly evaluated and adjusted as needed for the current workflow to <br />maintain the project design schedule so important to this project. <br />CITY OF LINO LAKES <br />Architect of Record <br />CNH Architects, Inc. <br />7300 W. 147th Street, Suite 504 <br />Apple Valley, MN 55124-7580 <br />952-431-4433 <br />Project Architect: Quinn S. Hutson, AIA, <br />LEED AP <br />Associate Architect: Brooke Jacobson, LEED <br />AP, CDT <br />Fire Training Design Consultant <br />The Stony Brook Design Studio <br />1031 Pineknot Drive <br />Cincinnati, OH 45238 <br />513-207-5185 <br />Public Safety Design Consultant: David J. <br />Acomb, RA, LEED AP <br />Mechanical/Electrical Engineers <br />Engineering Design Initiative, Ltd. (edi) <br />1112 Fifth Street North <br />Minneapolis, MN 55411 <br />612-343-5965 <br />Mechanical Engineer: Larry Svitak, PE <br />Electrical Engineer: Jay S. Hruby, PE <br />Structural/Civil Engineers <br />Larson Engineering <br />3524 Labore Road <br />White Bear Lake, MN 55110 <br />651-481-9120 <br />Structural Engineer: Matthew Johnson, PE <br />Civil Engineer: Michael A. Murphy, PE, LEED <br />AP <br />Quinn Hutson <br />Traffic Engineer <br />Wenck Associates, Inc. <br />1800 Pioneer Creek Ctr. <br />P.O. Box 249 <br />Maple Plain, MN 55359 <br />763-479-4200 <br />Traffic Engineer: Edward F. Terhaar, PE <br />Landscape Architect <br />Damon Farber Associates (DF) <br />401 2nd Avenue North <br />Suite 410 <br />Minneapolis, MN 55401 <br />612-332-7522 <br />Principal Landscape Architect: Thomas <br />Whitlock, ASLA <br />Cost Estimator <br />Professional Project Management (PPM) <br />1858 East Shore Drive <br />Maplewood, MN 55109 <br />651-776-5590 <br />Cost Estimator: Doug Holmberg <br />LINO LAKES FIRE HOUSE #2 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.