My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
07-14-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 2:25:05 PM
Creation date
10/16/2014 1:09:02 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
07/14/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. RELATED PROJECT EXPERIENCE <br />EAGAN CONSOLIDATED FIRE STATION DESIGN <br />EAGAN, MN <br />The Consolidated Fire Station designed for the Eagan Fire Department will replace two older fire <br />stations in a central location with quick access to this portion of the service area. The proposed <br />20,000 square foot walk -out facility will include five apparatus bays and support functions on the <br />lower level. The main entry on the upper level will provide access to the lobby and classroom <br />for the public. From this lobby separate access is also provided for firefighter functions including <br />dorm rooms, wellness, station office and dayroom. The facility is designed to include many in - <br />station training opportunities as well as a fenced exterior training plaza for extrication training <br />exercises to take place safely and out of general sight. <br />CNH Architects assisted the City of Eagan in evaluating multiple potential station sites, presenting <br />the benefits and liabilities of each for staff and Council review. After the City Council selected the <br />proposed site, we developed a full schematic design to determine image and provide a detailed <br />cost estimate. <br />Completed <br />Project Cost <br />Area (Sf) <br />Project Architect <br />In Design Phase <br />$3,950,000 (estimated) <br />20,100 <br />Quinn Hutson <br />CNH Architects <br />AG,r•.M CONSOLILJAIED FIRE S6ACI N <br />- <br />LINO LAKES FIRE HOUSE #2 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.