Laserfiche WebLink
c. Fencing, tree preservation measures and erosion control shall be installed <br />by the developer and inspected by the City prior to any soil disturbance. <br />15. Final Plat <br />a. The developer shall verify the drainage and utility easement is 10 feet <br />around the boundary of the wetland delineation. <br />b. The developer shall verify the drainage and utility easement is a minimum <br />of 10 feet beyond the basin's 100 -year storm high water level elevation. <br />c. The City Attorney shall review the final plat and title commitment. <br />i. Title issue regarding Debbie Tschida shall be resolved. <br />ii. Title issue regarding Nate Helmueller shall be resolved. <br />Adopted by the Council of the City of Lino Lakes this 8th day of September, 2014. <br />The motion for the adoption of the foregoing resolution was introduced by Council <br />Member <br />and was duly seconded by Council Member <br />upon vote being taken thereon, the following voted in favor thereof: <br />The following voted against same: <br />ATTEST: <br />Julianne Bartell, City Clerk <br />3 <br />and <br />Jeff Reinert, Mayor <br />