My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
09-08-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 1:55:56 PM
Creation date
10/20/2014 11:52:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Talan Ridge <br />Development Contract <br />September, 2014 <br />b. All of the work shall be under and subject to the inspection and <br />approval of the City and, where appropriate, any other <br />governmental agency having jurisdiction. <br />c. Prior to the acceptance of Developer Improvements by the City, the <br />Developer shall obtain final plat approval and record the final plat <br />which will dedicate all permanent easements necessary for the <br />construction and installation of the Developer and City <br />Improvements as determined by the City. <br />d. All construction debris and trash shall be properly disposed of at <br />the Developer's expense and in a timely manner as determined by <br />the City. <br />ix. The Developer shall construct and pay for all improvements as described <br />in the approved landscaping plan. <br />x. Record Drawings <br />a. Upon completion of construction of site improvements, and <br />grading, the developer shall submit two (2) sets of record <br />Developer Plans, two (2) electronic copies of record Developer <br />Plans in Anoka County NAD 83 Coordinates compatible with the <br />City's computer system, including accurate locations, dimensions, <br />elevations, grades, slopes and all other pertinent information <br />concerning the completed work. <br />xi. Faithful Performance of Construction Contracts and Surety <br />a. The Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Developer <br />for the installation and construction of all Developer <br />Improvements. <br />III. STORMWATER FACILITIES MAINTENANCE <br />a. The stormwater facilities serving the development include drainage swales and a <br />stormwater pond which also serves as an infiltration basin. The City will access <br />the stormwater system via drainage and utilities easements, and inspect the <br />stormwater pond and filtration basin, annually, to preserve storage capacity. The <br />City will also remove vegetation, maintain healthy plant growth and remove <br />excess sediment and debris to ensure that the facilities continue to perform per <br />design. Drainage swales will be inspected for conveyance of surface water to <br />ensure preservation of designed hydraulic capacity. <br />page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.