My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
09-08-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 1:55:56 PM
Creation date
10/20/2014 11:52:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Talan Ridge <br />Development Contract <br />September, 2014 <br />i. Sealcoating <br />ii. Aerial Photo <br />VI. TRUNK UTILITY & SURFACE WATER MANAGEMENT CHARGES <br />a. Trunk Sewer Unit Charges. <br />i. The City established trunk unit charges to uniformly distribute the costs of <br />public trunk sanitary sewer infrastructure. Each individual connection to <br />the sanitary sewer system shall be charged a unit charge per SAC unit <br />(currently at $2,975 per SAC unit). The unit charge shall be based on the <br />procedure outlined in the Metropolitan Environmental Services Service <br />Availability Charge Procedure Manual. Trunk sewer unit charges <br />addressed under this paragraph are in addition to any SAC charges <br />imposed by Metropolitan Council Environmental Services. An estimate of <br />the total charge and the trunk utility credit for developer installed trunk <br />oversizing is specified in Attachment B. <br />b. Trunk Water Unit Charges. <br />i. The City established trunk unit charges to uniformly distribute the costs of <br />public trunk water infrastructure. Each individual connection to the water <br />system shall be charged a unit charge per SAC unit (currently at $3,939 <br />per SAC unit). The unit charge shall be based on the procedure outlined in <br />the Metropolitan Environmental Services Service Availability Charge <br />Procedure Manual. An estimate of the total charge and the trunk utility <br />credit for developer installed trunk oversizing is specified in Attachment <br />B. <br />c. Surface Water Management Area Charges. <br />i. The City established a trunk area charge to uniformly distribute the costs <br />of public trunk surface water infrastructure and water quality <br />improvements. The Surface Water Management Charge shall be based on <br />developable acreage, in the amount specified in Attachment B. <br />d. Assessment of Charges and Waiver of Rights. <br />i. In consideration of the provision of sewer, water and storm water services, <br />the Developer agrees that the Trunk Sewer Unit Charge, Trunk Water Unit <br />Charge and the Surface Water Management Area Charge (collectively, <br />"the Charges") may be assessed against the Subdivision parcels. The <br />Developer hereby waives any and all procedural and substantive <br />objections to the special assessments, including notice and hearing <br />page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.