Laserfiche WebLink
CNH <br />LIS <br />PRELIMINARY COST ESTIMATE7111'"7. <br />COST ESTIMATE <br />THE FOLLOWING ESTIMATES INCLUDE: <br />• S ITEWO RK AROUND FIRE STATION <br />• SOIL CORRECTIONS <br />• BUILDING <br />• DESIGN CONTINGENCY <br />• INFLATION - ASSUME BIDDING JANUARY, <br />2015 <br />LINO LAKES FIRE HOUSE #2 <br />