COMPENSATING CHANGE ORDER NO. 2 <br />SANDHILL DRIVE STORM SEWER REMOVAL, CLEANING, AND REINSTALLATION <br />CITY OF LINO LAKES, MINNESOTA <br />PROJECT NO. 13849.002 <br />PERIOD ENDING: November 6, 2007 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT <br />SANITARY SEWER <br />1 MOBILIZATION LS 1 1.0 $ 525.00 $ 525.00 $ - $ 525.00 <br />2 REMOVE CONCRETE CURB AND GUTTER LF 120 82.0 $ 2.10 $ 172.20 $ (79.80) $ 252.00 <br />3 REMOVE BITUMINOUS SY 193 130.0 $ 3.00 $ 390.00 $ (189.00) $ 579.00 <br />4 GRUB STUMPS EA 9 9.0 $ 30.00 $ 270.00 $ $ 270.00 <br />5 SALVAGE/RESPREAD TOPSOIL LS 1 1.0 $ 425.00 $ 425.00 $ $ 425.00 <br />6 REMOVE/CLEAN /RELAY 300 LF 30" RCP LF 300 300.0 $ 57.50 $ 17,250.00 $ $ 17,250.00 <br />7 ROCK TRENCH STABILIZATION (1' DEPTH) CY 290 186.0 $ 40.00 $ 7,440.00 $ (4,160.00) $ 11,600.00 <br />8 ROD ALL PIPE JOINTS (LAST 3 AT FES MAY ALREADY BE DONE) LS 1 $ 3,050.00 <br />1.0 $ 3,050.00 $ $ 3,050.00 <br />9 WRAP ALL PIPE JOINTS WITH FABRIC LS 1 1.0 $ 210.00 $ 210.00 $ $ 210.00 <br />10 CLEAN OUT POND AREA AT FES (WASTE MATERIAL ON SITE) EA 6 $ 80.00 <br />6.0 $ 480.00 $ $ 480.00 <br />11 PLACE 1 -1/2" ROCK AT OUTFALLS (SEE DETAIL) CY 14 14.0 $ 42.00 $ 588.00 $ - $ 588.00 <br />12 CLASS 5 TN 70 120.0 $ 22.00 $ 2,640.00 $ 1,100.00 $ 1,540.00 <br />13 EROSION CONTROL BLANKET AT FES (EROSION LOGS) EA 6 - $ 80.00 $ - $ (480.00) $ 480.00 <br />14 WORK ZONE SIGNAGE - NOTIFY HOMES 24 HRS. BEFORE <br />START LS 1 1.0 $ 500.00 $ 500.00 $ - $ 500.00 <br />SUBTOTAL BASE BID $ 33,940.20 $ (3,808.80) $ 37,749.00 <br />CHANGE ORDER NO. 1 <br />1 8 -FOOT SECTION OF 30" RCP EA 5.0 5.0 $ 365.40 $ 1,827.00 $ - $ 1,827.00 <br />2 30" FLARED END SECTION EA 1.0 1.0 $ 590.00 $ 590.00 $ - $ 590.00 <br />3 ADDITIONAL TIE RODS - MATERIAL LS 1.0 1.0 $ 1,163.00 $ 1,163.00 $ - $ 1,163.00 <br />4 ADDITIONAL TIE RODS - LABOR LS 1.0 1.0 $ 1,200.00 $ 1,200.00 $ - $ 1,200.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 4,780.00 $ - $ 4,780.00 <br />COMPENSATING CHANGE ORDER NO. $ 38,720.20 $ (3,808.80) $ 42,529.00 <br />• <br />• <br />