Laserfiche WebLink
1 <br />1 <br />1 <br />f;fH'NC1L f'rt,t'ING <br />May 12, 1986 <br />Page Eight <br />Mr. Toddie was asked why the storm water will be run across to <br />the west rather than down the road ditch. Mr. Toddie-- explained <br />this way requires a` ditch that is very deep that could be hazardous. <br />A resident asked Mr. Toddie, when are you going to start digging? <br />He was also asked when the study will be done to determine who <br />will be the benefitted property owners? <br />Mr. Andrew Cardinal, the Lino Lakes representative on the RCWD <br />Board said at this point Lino Lakes has not presented a proper <br />petition for improvement of ditch #22. Mr. Willenbring said the <br />petition would initiate the study. <br />Mr. Marier reminded the RCWD that Lino Lakes did present a petition <br />for repair of. Ditch #22. Mr. Marier was told that the RCWD attor- <br />ney Mr. Murray had determined that this petition was not proper <br />and there has been no further action from Lino Lakes. <br />Mr. Hawkins explained what has transpired between Lino Lakes and <br />the RCWD to date with RCWD concluding that an improvement petition <br />not a repair petition is needed from _Lino_, Lakes. <br />Mr. Reinert asked Mr. Willenbring at what point would RCWD receive <br />a petition from Lino Lakes. Mr. Willenbring said he wanted to <br />review Mr. Toddies plans and determine if a repair project is all <br />that is needed or if an improvement project is required. <br />A lady in the audience told the Council that this area needs help <br />right now. She said "lets get going now, help us:" <br />A gentleman in the audience told the Council that the area residents <br />have been operating the pump for some time now and wanted action <br />for their relief. <br />Mr. Robinson asked if the study included the culvert under the Air <br />Park runway. He said if something was not done about this culvert <br />he would start a lawsuit tomorrow. Mr. Toddie explained he had <br />reviewed the culvert and explained its condition. <br />Mr. Marier said that since RCWD is waiting for some action from <br />Lino Lakes, he moved that the City resubmit a petition for repair <br />of ditch #22 to be drafted by the City Attorney and submit the <br />study prepared by the City Engineer to RCWD to inform RCWD of his <br />findings and approve Resolution 86 -10. Mr. Bohjanen seconded the <br />motion. <br />Mr. Bisel asked when an answer might be expected from RCWD. Mr. <br />Petranglo said assuming the petition was correct, 30 days or less. <br />