Laserfiche WebLink
• <br />3 <br />1. The EAW is incomplete because the analysis of transportation impacts does <br />not address long -range (year 2000) traffic conditions on affected roads and <br />highways. <br />2. The Pheasant Ridge Music Center will have an impact on the interchange <br />between Lexington Av. and I -35W. <br />3. Additional information is needed in order to assess the full impact of the <br />music center on mainline traffic on I -35W. <br />4. The EAW is incomplete because it does not indicate the receiving body of <br />water, although it appears to be Golden Lake; nor does it assess the impact <br />of the degraded stormwater on Golden Lake. <br />5. The Council urges the city of Blaine to complete its stormwater management <br />plan as soon as possible. <br />BGS173 <br />PHLPAI @6 <br />