Laserfiche WebLink
COUNCIL MEETING OCTOBER 26, 1987 <br />Iowns five acres with a home. These two parcels will be combined into <br />one lot. This subdivision would not create another building site. <br />Mr. Miller noted that approval of this request would change one <br />conforming and one nonconforming parcels into two conforming parcels <br />of land. The Park Board had reviewed the request and had been <br />misinformed regarding the purpose. They had recommended collecting a <br />park dedication fee since they understood this would create a new <br />building site. It has since been determined the purpose was not to <br />create a new building site. Mr. Bisel moved to approve application no. <br />87 -24. Mr. Bohjanen seconded the motion. Motion carried unanimously. <br />Site and Building Plan Review, Bastien Products - Mr. Miller explained <br />the request is for a 60' x 80' addition to the present building. The <br />construction will be of smooth face concrete and have the same <br />decoration as the current building. The stucco garage on the property <br />is to be removed. The request meets all set back requirements and the <br />Planning and Zoning Board has recommended approval with the addition <br />of foundation plantings. Mr. Marier moved to approve Planning and <br />Zoning Item No. 87 - 28 to include foundation plantings. Mr. Bisel <br />seconded the motion. Motion carried unanimously. Mr. Bisel thanked <br />the representative of Bastien Products for expanding his business in <br />Lino Lakes. <br />IMinor Subdivision, Twilight III - Mr. Joyer, representing El Rehbein <br />and Son requested that this item be rescheduled for the next Council <br />meeting. Mr. Marier moved to approve this request. Mr. Bohjanen <br />seconded the motion. Motion carried unanimously. <br />ENGINEER'S REPORT - RON STAHLBERG <br />Driveway Apron, North Road - Mr. Stahlberg explained that prior to the <br />project there were two gravel driveways, Mr. Doocy's and his <br />neighbors. During construction the contractor replaced Mr. Doocy's <br />driveway with a blacktop apron and replaced the neighbor's driveway <br />with a gravel apron. The contractor explained this was done because <br />Mr. Doocy has a garage and his neighbor does not. Mr. Stahlberg <br />explained that if it were up to TKDA neither driveway apron would have <br />been blacktopped. Mr. Stahlberg will pass this information along to <br />Mr. Doocy. <br />East Ash Street Improvement - Mr. Stahlberg explained that he has met <br />with the Ramsy County Engineer who explained that 15% of the trips <br />over this street would be generated by the regional park of residents <br />of White Bear Township and 85% of the trips would be generated by Lino <br />Lakes housing units. He told the Ramsey County Engineer that Lino <br />Lakes would not be interested in this presentation. Mr. Schumacher's <br />memorandum of October 21st outlines alternatives to Ramsey County's <br />suggestions. Mr. Stahlberg suggested that the Council approve Mr. <br />PAGE 9 <br />