My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/28/1988 Council Minutes (2)
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1988
>
03/28/1988 Council Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 10:58:12 AM
Creation date
10/30/2014 9:33:49 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
03/28/1988
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />COUNCIL MEETING MARCH 28, 1988 <br />Mr. Bisel agreed with Mr. Reinert and said if he had to vote <br />tonight, he would vote no. <br />Mr. Reinert felt that it should be determined if the lift <br />station is operating to capacity and also find out if the <br />City of Centerville is interested in extending a street to <br />Centerville Road. <br />Mr. Reinert moved to table the preliminary plat until these <br />two items are answered. Mr. Bisel seconded the motion. <br />Motion carried unanimously. <br />Mr. Hawkins noted that the tabling motion has no time limit <br />and explained that if the Council does not act on the plat <br />within a certain period of time the plat is automatically <br />approved. It was determined that action should take place <br />by the first of May, 1988. <br />Mr. Stahlberg said he would get a written statement from <br />MWCC on the capability of the lift station. Mr. Reinert <br />asked that Centerville be contacted for their input and this <br />information be given to the Council at the April 25th <br />Council meeting. <br />ENGINEER'S REPORT - RON STAHLBERG <br />Resolution No. 18 - 88. Ordering Feasibility Report for the <br />Area South of Baldwin Lake - Mr. Stahlberg explained the <br />area affected by this resolution. Mr. Bisel asked that Mr. <br />Stahlberg be more specific in future resolutions detailing <br />what improvements are planned. Mr. Bisel moved to approve <br />Resolution No. 18 - 88 and change the langauge to include <br />all City improvements. Mr. Bohjanen seconded the motion. <br />Motion carried unanimously. <br />CITY OF LINO LAKES <br />RESOLUTION NO. 18 - 88 <br />RESOLUTION ORDERING PREPARATION OF REPORT ON IMPROVEMENT OF <br />AREA THAT IS BOUNDED ON THE WEST BY THE CITY OF CIRCLE <br />PINES, ON THE SOUTH BY ASH STREET, ON THE NORTH BY BALDWIN <br />LAKE COURT AND THE REGIONAL PARK AND ON THE EAST BY HIGHWAY <br />#49 (HODGSON ROAD) <br />WHEREAS, it is proposed to improve the area bounded on the <br />west by Circle Pines, south by Ash Street, north <br />by the Regional Park and Baldwin Lake Court and <br />PAGE 9 <br />265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.