My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2004-008 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2004
>
2004-008 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2014 10:45:23 AM
Creation date
11/3/2014 2:07:24 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
01/12/2004
Council Meeting Type
Regular
Resolution #
04-008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7H. <br />STAFF ORIGINATOR: James E. Studenski, City Engineer. <br />COUNCIL MEETING DATE: January 12, 2004 <br />TOPIC: Resolution. No 04-08, Authorizing Preparation of Plans and <br />Specifications for Holly Drive Street. Reconstruction. <br />VOTE REQUIRED: Simple Majority <br />BACKGROUND: <br />Due to the continued development and growth of the area increasing the traffic <br />on this roadway and the deteriorating condition of 12th Avenue and Holly Drive <br />between Ash Street and Birch. Street, the City Council order a feasibility study for <br />the reconstruction of the street. The report was received at the October 28, <br />2002 Council meeting. <br />This segment of roadway is designated as a Municipal State Aid. Street and <br />serves as a minor collector within the City's Comprehensive Transportation Plan. <br />The feasibility proposed the improvements to be performed in three phases. The <br />first phase is from Holly Court to 12th Avenue. Through direction by the City <br />Council, the street improvements will consist of a City standard 32' roadway and <br />a separated 8.5' trail. <br />The street reconstruction portion of the project will be funded mostly through <br />Municipal State Aid. Funding will also come from the Trapper's Crossing <br />subdivision which was previously assessed $265,000.00 for the road <br />improvements. Surface Water Management and Trunk funds will complete the <br />funding for this project. The utility extensions will be minimal at this time. <br />It is staffs recommendation to authorize the preparation of plans and <br />specifications in the amount of $87,750.00 for the Holly Drive Reconstruction <br />project. <br />OPTIONS:. <br />1 Adopt. Resolution No. 04 -08, Authorizing the Preparation of Plans and <br />Specifications for the Holly Drive Reconstruction project. <br />2. Return to staff for further review. <br />RECOMMENDATION: <br />Option No. 1 Staff recommends that Resolution No. 04 -08 be adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.