Laserfiche WebLink
• <br />building permit. The church is responsible for submitting to the City proof of the <br />agreement. <br />21. The sewer line from the building line to the wastewater treatment system tanks must <br />be insulated to prevent freezing. <br />22. A fence or other barrier shall be built to protect the wastewater treatment areas. <br />23. The church shall submit to the City the servicing /monitoring plan acceptable to the <br />City for the wastewater treatment system. <br />24. The church shall connect to the public sanitary sewer system within 24 months of the <br />public service becoming available. <br />25. The church shall connect to the public water system within 24 months of the public <br />service becoming available. <br />26. Street lights typical for road intersections shall be installed at the church's cost at the <br />end of each access driveway on CSAH 21 (20th Ave.). <br />27. The City has the right periodically to review the conditional use permit for <br />compliance with these conditions and for the protection of the public health, safety, <br />and welfare. <br />28. The well drilling shall not begin prior to July 15th, 2004. Grading and construction on <br />the site shall not begin prior to June 1St, 2004. <br />BE IT FURTHER RESOLVED that this resolution is based on the following plans and <br />related information: <br />1. Eagle Brook Church Traffic Study, Supplemental Analysis, Draft Memorandum, <br />Including Updates: February 2, February 23, March 5, March 15, 2004 <br />2. Preliminary Plat, 10/10/03, rec'd12 /18/03 <br />3. Certificate of Survey, SRF, 10/10/03 <br />4. Site Plan, BWBR and SRF, 12/18/03, received 12/18/03 <br />5. Grading Plan, BWBR and SRF, 12/18/03, received 12/18/03 <br />6. Utility Plan, BWBR and SRF, 12/18/03, received 12/18/03 <br />7. Construction Plan, SRF /18/03, received 12/18/03 <br />8. Landscaping Plan, BWBR, 12/18/03, received 12/18/03 <br />9. Tree Preservation Plan, BWBR, 12/18/03, received 12/18/03 <br />10. Signage and Building Cross Details, 12/17/03, received 12/18/03 <br />11. First and Second Floor Plans, BWBR, 10/13/03, corrected square footages e -mail <br />from Ron Laughlin, BWBR <br />12. Building Elevations, BWBR, 10/13/03 <br />• 13. Photometric Plan, BWBR and Ericksen Ellison and Assoc., 10/14/03, received <br />10/15/03 <br />14. Lighting Fixture cutsheets, Lithonia Lighting <br />Resolution 04 -17, page 6 <br />