Circle-Lex VFW
<br /> page 10
<br /> - This review is based on the following submittals, received December 18, 2003 unless
<br /> otherwise noted:
<br /> 1. Site Plan, DSGW,received January 21,2004
<br /> 2. Grading Plan, Metro Land Surveying& Engineering, received January 21,2004
<br /> 3. Utility Plan,Metro Land Surveying&Engineering,received January 21,2004
<br /> 4. Memo from Michael J. Thomas,DSGW,December 4,2003, rec'd. January 21,2004
<br /> 5. Letter from Brian Bourassa,Metro Land Surveying&Engineering, January 20,2004,
<br /> rec'd. January 21, 2004.
<br /> 6. Wall Section, December 18,2003
<br /> 7. Floor Plan,DSGW, July 7, 2003
<br /> 8. Exterior Elevations,DSGW,July 7, 2003
<br /> 9. Landscape Plan,DSGW,December 18,2003
<br /> 10.Landscape Details, DSGW,December 18, 2003
<br /> 11.Photometric Lighting Analysis,Engineering Design Initiative, December 18, 2003
<br /> 12.Boundary and Topographic Survey, E.G. Rud& Sons,Inc., 9/05/03,rec'd 10/10/03
<br /> 13. Code Data,DSGW, 10/9/03,rec'd 10/10/03
<br /> 14.Floor Plan,DSGW, 10/9/03,rec'd 10/10/03
<br /> 15. Exterior Elevation,DSGW, 10/9/03,rec'd 10/10/03
<br /> 16. Building Section, DSGW, 10/9/03,rec'd 10/10/03
<br /> •
<br />
|