18. This approval is based on the following plans and related correspondence:
<br /> • Site Plan, DSGW,received January 21, 2004
<br /> • Grading Plan, Metro Land Surveying&Engineering, received January 21, 2004
<br /> • Utility Plan, Metro Land Surveying & Engineering, received January 21, 2004
<br /> • Memo from Michael J. Thomas, DSGW, December 4, 2003,rec'd. January 21,
<br /> 2004
<br /> • Letter from Brian Bourassa, Metro Land Surveying& Engineering, January 20,
<br /> 2004, rec'd. January 21, 2004.
<br /> • Wall Section, December 18, 2003
<br /> • Floor Plan, DSGW, July 7, 2003
<br /> • Exterior Elevations, DSGW, July 7, 2003
<br /> • Landscape Plan, DSGW, December 18,2003
<br /> • Landscape Details, DSGW, December 18, 2003
<br /> • Photometric Lighting Analysis, Engineering Design Initiative, December 18,
<br /> 2003
<br /> • Boundary and Topographic Survey, E.G. Rud& Sons, Inc., 9/05/03, rec'd
<br /> 10/10/03
<br /> • Code Data, DSGW, 10/9/03,rec'd 10/10/03
<br /> • Floor Plan, DSGW, 10/9/03,rec'd 10/10/03
<br /> • Exterior Elevation, DSGW, 10/9/03, rec'd 10/10/03
<br /> • Building Section, DSGW, 10/9/03, rec'd 10/10/03
<br /> BE IT FURTHER RESOLVED that the Lino Lakes City Council hereby approves
<br /> setback variances to allow the building to be 34 feet from the new Lake Drive right of
<br /> way, and the parking drive to be 5 feet from the new Lake Drive right of way.
<br /> Adopted by the Lino Lakes City Council this 9th day of February, 2004
<br /> John JlBergefon, Mayor
<br /> ATTEST:
<br /> Ann Blair, City Clerk
<br /> Resolution 04-18,page 3
<br />
|