My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2004-044 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2004
>
2004-044 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2014 4:04:50 PM
Creation date
11/4/2014 1:11:34 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
04/12/2004
Council Meeting Type
Regular
Resolution #
04-044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 6F <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: April 12, 2004 <br />TOPIC: Resolution No. 04 -44, Accepting Bids and Awarding Construction <br />Contract, 62nd Street Reconstruction <br />VOTE REQUIRED: 3/5 Vote Required <br />BACKGROUND: <br />Sealed bids were received and publicly opened at 10:00 a.m. on April 2, 2004. The <br />results of the bid opening are presented below. City Council action is required to award <br />a construction contract to the lowest responsible bidder. <br />Contractor Amount of Bid <br />Arnt Construction Co., Inc. $ 930,219.38 <br />Central Landscaping, Inc. $ 936,304.39* <br />F.M. Frattalone $ 954,475.11* <br />Dresel Construction, Inc. $1,047,622.49 <br />Forest Lake Contracting, Inc. $1,079,254.95 <br />Three Rivers Construction $1,133,377.19 <br />Engineer's Estimate $1,133,076.20 <br />The low bid is approximately 18% under the Engineer's Estimate for this project. A copy <br />of the complete bid tabulation is attached. There was an error in the total amount of bid <br />by F.M. Frattalone. Their total bid amount increased and eliminated them as the low <br />bidder. F.M. Frattalone has been notified of the error and is in agreement with the <br />change in results. <br />The substantial completion date for this project is September 15, 2004, with a final <br />completion date of October 30, 2004. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 04-44, Accepting Bids and Awarding a Construction <br />Contract to Arnt Construction Co., Inc. for the 62 "d Street Reconstruction project. <br />3. Not adopt Resolution No 04 -44. <br />RECOMMENDATION: <br />Option No 2 - Staff recommends adoption of Resolution Number 04 -44. <br />
The URL can be used to link to this page
Your browser does not support the video tag.