Laserfiche WebLink
TABULATION OF BIDS <br />62ND STREET RECONSTRUCTION <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO. 12510 -02 <br />BIDS OPENED: APRIL 2, 2004, AT 10 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />F.M. FRATTALONE DRESEL CONTRACTING <br />ITE MN /DOT UNIT TOTAL UNIT TOTAL <br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />TKDA <br />ENGINEERS •ARCHITECTS • PLANNERS <br />FOREST LAKE CONTRACTING <br />UNIT TOTAL <br />PRICE AMOUNT <br />62ND STREET RECONSTRUCTION <br />1 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 41,400.00 <br />$ 41,400.00 <br />$ 30,000.00 <br />$ 30,000.00 <br />$ 52,000.00 <br />$ 52,000.00 <br />2 <br />2101.502 <br />CLEARING <br />260 <br />TR <br />$ 10.25 <br />$ 2,665.00 <br />$ 10.25 <br />$ 2,665.00 <br />$ 12.00 <br />$ 3,120.00 <br />3 <br />2101.507 <br />GRUBBING <br />260 <br />TR <br />$ 10.25 <br />$ 2,665.00 <br />$ 10.25 <br />$ 2,665.00 <br />$ 12.00 <br />$ 3,120.00 <br />4 <br />2104.501 <br />REMOVE PIPE (CULVERT OR STORM SEWER) <br />331 <br />LF <br />$ 6.00 <br />$ 1,986.00 <br />$ 8.50 <br />$ 2,813.50 <br />$ 9.00 <br />$ 2,979.00 <br />5 <br />2104.501 <br />REMOVE CURB & GUTTER (ALL TYPES) <br />788 <br />LF <br />$' 2.00 <br />$ 1,576.00 <br />$ 2.50 <br />$ 1,970.00 <br />$ 2.50 <br />$ 1,970.00 <br />6 <br />2104.501 <br />REMOVE FENCE <br />1,061 <br />LF <br />$ 1.50 <br />$ 1,591.50 <br />$ 1.25 <br />$ 1,326.25 <br />$ 2.00 <br />$ 2,122.00 <br />7 <br />2104.501 <br />REMOVE WATERMAIN <br />5 <br />LF <br />$ 10.00 <br />$ 50.00 <br />$ 15.00 <br />$ 75.00 <br />$ 50.00 <br />$ ' 250.00 <br />8 <br />2104.503 <br />REMOVE CONCRETE PAVEMENT (DRIVEWAY) <br />220 <br />SF <br />$ 1.00 <br />$ 220.00 <br />$ 2.00 <br />$ 440.00 <br />$ 1.00 <br />$ 220.00 <br />9 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING <br />13,706 <br />SY <br />$ 1.25 <br />$ 17,132.50 <br />$ 1.75 <br />$ 23,985.50 <br />$ 1.50 <br />$ 20,559.00 <br />10 <br />2104.509 <br />REMOVE SIGN TYPE C <br />1 <br />EA <br />$ 15.00 <br />$ 15.00 <br />$ 20.00 <br />$ 20.00 <br />$ 20.00 <br />$ 20.00 <br />11 <br />2104.511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />50 <br />LF <br />$ 10.00 <br />$ 500.00 <br />$ 3.50 <br />$ 175.00 <br />$ 6.00 <br />$ 300.00 <br />12 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />430 <br />LF <br />$ 1.00 <br />$ 430.00 <br />$ 3.00 <br />$ 1,290.00 <br />$ 3.00 <br />$ 1,290.00 <br />13 <br />2104.523 <br />SALVAGE MAIL BOX SUPPORT <br />9 <br />EA <br />$ 25.00 <br />$ 225.00 <br />$ 30.00 <br />$ 270.00 <br />$ 40.00 <br />$ 360.00 <br />14 <br />2104.523 <br />SALVAGE SIGN <br />8 <br />EA <br />$ 15.00 <br />$ 120.00 <br />$ 20.00 <br />$ 160.00 <br />$ 20.00 <br />$ 160.00 <br />15 <br />2104.523 <br />SALVAGE GATE VALVE & BOX <br />1 <br />EA <br />$ 200.00 <br />$ 200.00 <br />$ 350.00 <br />$ 350.00 <br />$ 700.00 <br />$ 700.00 <br />16 <br />2105.501 <br />COMMON EXCAVATION <br />3,562 <br />CY <br />$ 12.65 <br />$ 45,059.30 <br />$ 8.50 <br />$ 30,277.00 <br />$ 14.00 <br />$ 49,868.00 <br />17 <br />2105.505 <br />MUCK EXCAVATION <br />5,574 <br />CY <br />$ 3.45 <br />$ 19,230.30 <br />$ 7.50 <br />$ 41,805.00 <br />$ 6.00 <br />$ 33,444.00 <br />18 <br />2105.507 <br />SUBGRADE EXCAVATION <br />2,000 <br />CY <br />$ 3.55 <br />$ 7,100.00 <br />$ 7.50 <br />$ 15,000.00 <br />$ 6.00 <br />$ 12,000.00 <br />19 <br />2105.511 <br />DITCH EXCAVATION <br />205 <br />CY <br />$ 10.00 <br />$ 2,050.00 <br />$ 8.50 <br />$ 1,742.50 <br />$ 15.00 <br />$ 3,075.00 <br />20 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />11,530 <br />CY <br />$ 11.05 <br />$ 127,406.50 <br />$ 11.75 <br />$ 135,477.50 <br />$ 13.00 <br />$ 149,890.00 <br />21 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />2,503 <br />CY <br />$ 7.00 <br />$ 17,521.00 <br />$ 10.00 <br />$ 25,030.00 <br />$ 11.00 <br />$ 27,533.00 <br />22 <br />2105.603 <br />CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING) <br />3,000 <br />LF <br />$ 1.50 <br />$ 4,500.00 <br />$ 5.00 <br />$ 15,000.00 <br />$ 4.00 <br />$ 12,000.00 <br />23 <br />2105.604 <br />GEOTEXTILE FABRIC TYPE IV <br />855 <br />SY <br />$ 1.50 <br />$ 1,282.50 <br />$ 1.50 <br />$ 1,282.50 <br />$ 1.25 <br />$ 1,068.75 <br />24 <br />2123.61 <br />EXPLORATORY DIGGING <br />10 <br />HR <br />$ 135.00 <br />$ 1,350.00 <br />$ 150.00 <br />$ 1,500.00 <br />$ 150.00 <br />$ 1,500.00 <br />25 <br />2211.501 <br />AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, & <br />DRIVEWAY (100% CRUSHED) <br />10,669 <br />TN <br />$ 8.70 <br />$ 92,820.30 <br />$ 13.75 <br />$ 146,698.75 <br />$ 12.00 <br />$ 128,028.00 <br />26 <br />2350.501 <br />TYPE LV AGG. 3 WEARING COURSE (B) (STREET) <br />1,661 <br />TN <br />$ 32.75 <br />$ 54,397.75 <br />$ 29.85 <br />$ 49,580.85 <br />$ 30.00 <br />$ 49,830.00 <br />27 <br />2350.501 <br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) <br />411 <br />TN <br />$ 39.75 <br />$ 16,337.25 <br />$ 36.16 <br />$ 14,861.76 <br />$ 37.00 <br />$ 15,207.00 <br />28 <br />2350.502 <br />TYPE LV AGG. 3 NON - WEARING COURSE (B) (STREET) <br />1,622 <br />TN <br />$ 30.50 <br />$ 49,471.00 <br />$ 29.39 <br />$ 47,670.58 <br />$ 30.00 <br />$ 48,660.00 <br />29 <br />2350.503 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR <br />DRIVEWAYS (B) <br />215 <br />SY <br />$ 8.70 <br />$ 1,870.50 <br />$ 5.80 <br />$ 1,247.00 <br />$ 14.00 <br />$ 3,010.00 <br />30 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />664 <br />GAL <br />$ 1.25 <br />$ 830.00 <br />$ 1.40 <br />$ 929.60 <br />$ 1.50 <br />$ 996.00 <br />31 <br />2501.515 <br />12" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 700.00 <br />$ 700.00 <br />$ 675.00 <br />$ 675.00 <br />$ 700.00 <br />$ 700.00 <br />32 <br />2501.515 <br />15" RC PIPE APRON W/ TRASH GUARD <br />14 <br />EA <br />$ 765.00 <br />$ 10,710.00 <br />$ 700.00 <br />$ 9,800.00 <br />$ 800.00 <br />$ 11,200.00 <br />33 <br />2501.515 <br />18" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 825.00 <br />$ 825.00 <br />$ 750.00 <br />$ 750.00 <br />$ 800.00 <br />$ 800.00 <br />34 <br />2501.515 <br />24" RC PIPE APRON W/ TRASH GUARD <br />2 <br />EA <br />$ 1,200.00 <br />$ 2,400.00 <br />$ 900.00 <br />$ 1,800.00 <br />$ 900.00 <br />$ 1,800.00 <br />35 <br />2502.541 <br />12" RC PIPE SEWER CLASS V DESIGN 3006 <br />195 <br />LF <br />$ 25.30 <br />$ 4,933.50 <br />$ 24.00 <br />$ 4,680.00 <br />$ 26.00 <br />$ 5,070.00 <br />36 <br />2503.541 <br />15" RC PIPE SEWER CLASS V DESIGN 3006 <br />1,129 <br />LF <br />$ 26.60 <br />$ 30,031.40 <br />$ 25.00 <br />$ 28,225.00 <br />$ 24.00 <br />$ 27,096.00 <br />37 <br />2503.541 <br />18" RC PIPE SEWER CLASS V DESIGN 3006 <br />392 <br />LF <br />$ 28.00 <br />$ 10,976.00 <br />$ 28.00 <br />$ 10,976.00 <br />$ 27.00 <br />$ 10,584.00 <br />38 <br />2503.541 <br />24" RC PIPE SEWER CLASS III DESIGN 3006 <br />71 <br />LF <br />$ 33.00 <br />$ 2,343.00 <br />$ 33.00 <br />$ 2,343.00 <br />$ 45.00 <br />$ 3,195.00 <br />39 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER) <br />4 <br />EA <br />$ 1,300.00 <br />$ 5,200.00 <br />$ 600.00 <br />$ 2,400.00 <br />$ 1,000.00 <br />$ 4,000.00 <br />40 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (STORM SEWER) <br />2 <br />EA <br />$ 2,000.00 <br />$ 4,000.00 <br />$ 600.00 <br />$ ' 1,200.00 <br />$ 1,000.00 <br />$ 2,000.00 <br />41 <br />2503.602 <br />8 "X4" PVC WYE (SCHEDULE 40) <br />12 <br />EA <br />$ 110.00 <br />$ 1,320.00 <br />$ 135.00 <br />$ 1,620.00 <br />$ 60.00 <br />$ 720.00 <br />42 <br />2503.602 <br />8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH) <br />384 <br />LF <br />$ 19.30 <br />$ 7,411.20 <br />$ 17.00 <br />$ 6,528.00 <br />$ 20.00 <br />$ 7,680.00 <br />43 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) <br />184 <br />LF <br />$ 20.30 <br />$ 3,735.20 <br />$ 18.00 <br />$ 3,312.00 <br />$ 25.00 <br />$ 4,600.00 <br />w <br />Page 4 <br />