Laserfiche WebLink
TABULATION OF BIDS <br />62ND STREET RECONSTRUCTION <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO. 12510 -02 <br />BIDS OPENED: APRIL 2, 2004, AT 10 AM <br />'DENOTES ERROR IN BIDDERS CALCULATION THREE RIVERS <br />CONSTRUCTION <br />ITE MN /DOT ' UNIT TOTAL UNIT TOTAL <br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />��� <br />ENGINEERS • ARCHITECTS • PLANNERS <br />UNIT TOTAL <br />PRICE AMOUNT <br />62ND STREET RECONSTRUCTION <br />1 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 14,652.50 <br />$ 14,652.50 <br />$ <br />$ - <br />2 <br />2101.502 <br />CLEARING <br />260 <br />TR <br />$ 39.49 <br />$ 10,267.40 <br />$ <br />$ - <br />3 <br />2101.507 <br />GRUBBING <br />260 <br />TR <br />$ 24.13 <br />$ 6,273.80 <br />$ - <br />$ - <br />4 <br />2104.501 <br />REMOVE PIPE (CULVERT OR STORM SEWER) <br />331 <br />LF <br />$ 8.00 <br />$ 2,648.00 <br />$ <br />$ - <br />5 <br />2104.501 <br />REMOVE CURB & GUTTER (ALL TYPES) <br />788 <br />LF <br />$ 3.00 <br />$ 2,364.00 <br />$ <br />$ <br />6 <br />2104.501 <br />REMOVE FENCE <br />1,061 <br />LF <br />$ 1.00 <br />$ 1,061.00 <br />$ <br />$ - <br />7 <br />2104.501 <br />REMOVE WATERMAIN <br />5 <br />LF <br />$ 50.00 <br />$ 250.00 <br />$ <br />$ <br />8 <br />2104.503 <br />REMOVE CONCRETE PAVEMENT (DRIVEWAY) <br />220 <br />SF <br />$ 1.00 <br />$ 220.00 <br />$ - <br />$ - <br />9 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING <br />13,706 <br />SY <br />$ 3.32 <br />$ 45,503.92 <br />$ <br />$ <br />10 <br />2104.509 <br />REMOVE SIGN TYPE C <br />1 <br />EA <br />$ 15.45 <br />$ 15.45 <br />$ <br />$ - <br />11 <br />2104.511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />50 <br />LF <br />$ 3.09 <br />$ 154.50 <br />$ <br />$ - <br />12 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />430 <br />LF <br />$ 2.06 <br />$ 885.80 <br />$ <br />$ <br />13 <br />2104.523 <br />SALVAGE MAIL BOX SUPPORT <br />9 <br />EA <br />$ 25.75 <br />$ 231.75 <br />$ <br />$ - <br />14 <br />2104.523 <br />SALVAGE SIGN <br />8 <br />EA <br />$ 15.45 <br />$ 123.60 <br />$ <br />$ - <br />15 <br />2104.523 <br />SALVAGE GATE VALVE & BOX <br />1 <br />EA <br />$ 250.00 <br />$ 250.00 <br />$ <br />$ <br />16 <br />2105.501 <br />COMMON EXCAVATION <br />3,562 <br />CY <br />$ 5.22 <br />$ 18,593.64 <br />$ <br />$ - <br />17 <br />2105.505 <br />MUCK EXCAVATION <br />5,574 <br />CY <br />$ 6.60 <br />$ 36,788.40 <br />$ <br />$ <br />18 <br />2105.507 <br />SUBGRADE EXCAVATION <br />2,000 <br />CY <br />$ 6.60 <br />$ ' 13,200.00 <br />$ - <br />$ - <br />19 <br />2105.511 <br />DITCH EXCAVATION <br />205 <br />CY <br />$ 15.25 <br />$ 3,126.25 <br />$ <br />$ - <br />20 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />11,530 <br />CY <br />$ 17.30 <br />$ 199,469.00 <br />$ - <br />$ - <br />21 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />2,503 <br />CY <br />$ 12.95 <br />$ 32,413.85 <br />$ <br />$ <br />22 <br />2105.603 <br />CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING) <br />3,000 <br />LF <br />$ 3.32 <br />$ 9,960.00 <br />$ <br />$ - <br />23 <br />2105.604 <br />GEOTEXTILE FABRIC TYPE IV <br />855 <br />SY <br />$ 2.64 <br />$ 2,257.20 <br />$ <br />$ - <br />24 <br />2123.61 <br />EXPLORATORY DIGGING <br />10 <br />HR <br />$ 150.00 <br />$ 1,500.00 <br />$ - <br />$ <br />25 <br />2211.501 <br />AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, & <br />DRIVEWAY (100% CRUSHED) <br />10,669 <br />TN <br />$ 10.92 <br />$ 116,505.48 <br />$ <br />$ <br />26 <br />2350.501 <br />TYPE LV AGG. 3 WEARING COURSE (B) (STREET) <br />1,661 <br />TN <br />$ 33.73 <br />$ 56,025.53 <br />$ <br />$ <br />27 <br />2350.501 <br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) <br />411 <br />TN <br />$ 40.94 <br />$ 16,826.34 <br />$ <br />$ <br />28 <br />2350.502 <br />TYPE LV AGG. 3 NON- WEARING COURSE (B) (STREET) <br />1,622 <br />TN <br />$ 31.42 <br />$ 50,963.24 <br />$ <br />$ - <br />29 <br />2350.503 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR <br />DRIVEWAYS (B) <br />215 <br />SY <br />$ 8.96 <br />$ 1,926.40 <br />$ <br />$ <br />30 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />664 <br />GAL <br />$ 1.29 <br />$ 856.56 <br />$ <br />$ - <br />31 <br />2501.515 <br />12" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 550.05 <br />$ 550.05 <br />$ - <br />$ - <br />32 <br />2501.515 <br />15" RC PIPE APRON W/ TRASH GUARD <br />14 <br />EA <br />$ 613.56 <br />$ 8,589.84 <br />$ <br />$ <br />33 <br />2501.515 <br />18" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 693.18 <br />$ 693.18 <br />$ <br />$ - <br />34 <br />2501.515 <br />24" RC PIPE APRON W/ TRASH GUARD <br />2 <br />EA <br />$ 1,117.89 <br />$ 2,235.78 <br />$ - <br />$ - <br />35 <br />2502.541 <br />12" RC PIPE SEWER CLASS V DESIGN 3006 <br />195 <br />LF <br />$ 22.64 <br />$ 4,414.80 <br />$ - <br />$ - <br />36 <br />2503.541 <br />15" RC PIPE SEWER CLASS V DESIGN 3006 <br />1,129 <br />LF <br />$ 25.21 <br />$ 28,482.09 <br />$ <br />$ <br />37 <br />2503.541 <br />18" RC PIPE SEWER CLASS V DESIGN 3006 <br />392 <br />LF <br />$ 28.34 <br />$ 11,109.28 <br />$ <br />$ <br />38 <br />2503.541 <br />24" RC PIPE SEWER CLASS III DESIGN 3006 <br />71 <br />LF <br />$ 32.65 <br />$ 2,318.15 <br />$ <br />$ - <br />39 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER) <br />4 <br />EA <br />$ 1,471.88 <br />$ 5,887.52 <br />$ - <br />$ - <br />40 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (STORM SEWER) <br />2 <br />EA <br />$ 836.25 <br />$ 1,672.50 <br />$ - <br />$ - <br />41 <br />2503.602 <br />8 "X4" PVC WYE (SCHEDULE 40) <br />12 <br />EA <br />$ 48.16 <br />$ 577.92 <br />$ <br />$ <br />42 <br />2503.602 <br />8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH) <br />384 <br />LF <br />$ 40.15 <br />$ 15,417.60 <br />$ <br />$ <br />43 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) <br />184 <br />LF <br />$ 43.15 <br />$ 7,939.60 <br />$ <br />$ - <br />Page 7 <br />