Laserfiche WebLink
Development Contract <br />Century Farm North 2nd Addition 4 -26 -2004 <br />Tree Preservation Plan <br />Developer will provide a tree preservation plan prior to any site <br />grading which shall be in accordance with the City Tree Preservation <br />Policy. Developer shall escrow for boulevard tree planting for each <br />side of a lot which abuts a street. The City Forester shall determine <br />species, size and location. <br />The Developer shall remove, dispose of, or treat all dead and <br />diseased trees in accordance with the City Forester's <br />recommendation before building permits will be issued. <br />Grading and Erosion Control Construction & Maintenance <br />a) Prior to the commencement of site grading and erosion control, the <br />Developer shall complete items ILA.1, II.A.2, and II.A.3 as listed <br />above. <br />The Developer shall grade the site to within 0.2 foot of the grades <br />shown on the approved grading plan. No deviations will be allowed <br />unless a revised plan is submitted and approved by the City and all <br />other regulatory agencies. <br />All development shall conform to the natural limitations presented <br />by the topography and soil of the subdivision in order to create the <br />best potential for preventing soil erosion. <br />Erosion and siltation control measures shall be coordinated with the <br />different stages of development. Appropriate control measures as <br />required by the City shall be installed prior to development when <br />necessary to control erosion. <br />Land shall be developed in increments of workable size such that <br />adequate erosion and siltation controls can be provided as <br />construction progresses. The smallest practical area of land shall be <br />exposed at any one period of time. <br />Where the topsoil is removed, sufficient arable soil shall be set aside <br />for respreading over the developed area The topsoil shall be <br />restored to a depth of at least four (4) inches and shall be of a quality <br />at least equal to the soil quality prior to development. <br />page 3 <br />