Laserfiche WebLink
TABULA'N OF BIDS <br />• <br />MARSHAN LANE UTILITY IMPROVEMENTS TKDA <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO. 12857 -01 <br />ENGINEERS • ARCHITECTS • PLANNERS <br />BIDS OPENED: JULY 7, 2004, AT 2:00 PM <br />"DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEER'S ESTIMATE DAVE PERKINS CONTRACTING PENN CONTRACTING NORTHDALE CONSTRUCTION <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />REMOVALS AND RESTORATION <br />1 MOBILIZATION 1 LS $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 14,000.00 $ 14,000.00 $ 12,750.00 $ 12,750.00 <br />2 TRAFFIC CONTROL 1 LS $ 4,000.00 $ 4,000.00 $ 1,200.00 $ 1,200.00 $ 2,800.00 $ 2,800.00 $ 5,512.50 $ 5,512.50 <br />3 CLEARING AND GRUBBING 1 LS $ 7,000.00 $ 7,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 8,500.00 $ 8,500.00 <br />4 SALVAGE/RESTORE SIGNS AND MAILBOX SUPPORTS 1 LS $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 1,627.50 $ 1,627.50 <br />5 REMOVE CONCRETE CURB AND GUTTER 65 LF $ 4.00 $ 260.00 $ 5.00 $ 325.00 $ 3.00 $ 195.00 $ 3.50 $ 227.50 <br />6 REMOVE CONCRETE DRIVEWAY (ALL DEPTHS) 75 SY $ 4.00 $ 300.00 $ 5.00 $ 375.00 $ 3.00 $ 225.00 $ 3.50 $ 262.50 <br />7 REMOVE BIT. DRIVEWAY PAVEMENT (ALL DEPTHS) 675 SY $ 3.00 $ 2,025.00 $ 3.00 $ 2,025.00 $ 2.00 $ 1,350.00 $ 3.00 $ 2,025.00 <br />8 REMOVE BIT. STREET PAVEMENT (ALL DEPTHS) 2300 SY $ 2.35 $ 5,405.00 $ 2.00 $ 4,600.00 $ 2.00 $ 4,600.00 $ 2.00 $ 4,600.00 <br />9 WATER FOR DUST CONTROL 10 PER M $ 20.00 $ 200.00 $ 100.00 $ 1,000.00 $ 80.00 $ 800.00 $ 45.00 $ 450.00 <br />10 SUBGRADE PREPARATION 8 RDST $ 110.00 $ 880.00 $ 175.00 $ 1,400.00 $ 250.00 $ 2,000.00 $ 175.00 $ 1,400.00 <br />11 COMMON EXCAVATION (STREET /DRWY) 1200 CY $ 10.00 $ 12,000.00 $ 10.00 $ 12,000.00 $ 5.00 $ 6,000.00 $ 8.00 $ 9,600.00 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) <br />12 (STREET /DRWY /PATCH) 1,160 TON $ 11.00 $ 12,760.00 $ 14.00 $ 16,240.00 $ 13.00 $ 15,080.00 $ 13.65 $ 15,834.00 <br />2" BITUMINOUS PAVEMENT (STREET) <br />13 (TYPE LV3 WEAR COURSE MIXTURE C) 300 TON $ 42.00 $ 12,600.00 $ 45.00 $ 13,500.00 $ 48.00 $ 14,400.00 $ 46.20 $ 13,860.00 <br />14 CONCRETE CURB AND GUTTER 65 LF $ 20.00 $ 1,300.00 $ 30.00 $ 1,950.00 $ 20.00 $ 1,300.00 $ 21.00 $ 1,365.00 <br />15 6" CONCRETE DRIVEWAY PAVEMENT 75 SY $ 35.00 $ 2,625.00 $ 45.00 $ 3,375.00 $ 45.00 $ 3,375.00 $ 50.18 $ 3,763.50 <br />2" BITUMINOUS DRIVEWAY PATCH <br />16 (TYPE LV4 WEAR COURSE MIXTURE C) 675 SY $ 15.00 $ 10,125.00 $ 18.00 $ 12,150.00 $ 14.00 $ 9,450.00 $ 11.86 $ 8,005.50 <br />17 INSTALL MAILBOX SUPPORTS 4 EA $ 100.00 $ 400.00 $ 125.00 $ 500.00 $ 100.00 $ 400.00 $ 78.75 $ 315.00 <br />18 SILT FENCE 700 LF $ 2.00 $ 1,400.00 $ 2.50 $ 1,750.00 $ 2.30 $ 1,610.00 $ 2.00 $ 1,400.00 <br />REMOVE AND REPLACE EXISTING STORM SEWER <br />19 SYSTEM 1 LS $ 5,000.00 $ 5,000.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 6,500.00 $ 6,500.00 <br />20 SOD WITH 4" TOP SOIL 2200 SY $ 2.80 $ 6,160.00 $ 3.00 $ 6,600.00 $ 3.50 $ 7,700.00 $ 3.17 $ 6,974.00 <br />21 SEEDING W /FERTILIZER, MULCH AND TOPSOIL 0.5 AC $ 1,000.00 $ 500.00 $ 1,500.00 $ 750.00 $ 1,500.00 $ 750.00 $ 1,890.00 $ 945.00 <br />22 EXPLORATORY DIGGING 2 HR $ 280.00 $ 560.00 $ 275.00 $ 550.00 $ 120.00 $ 240.00 $ 150.00 $ 300.00 <br />SUBTOTAL DIVISION I $ 96,000.00 $ 93,790.00 $ 94,275.00 $ 106,217.00 <br />WATERMAIN CONSTRUCTION <br />1 CONNECT TO EXISTING WATERMAIN 1 EA $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 1,000.00 $ 1,108.63 $ 1,108.63 <br />2 8" DIP WATERMAIN CLASS 52 942 LF $ 26.00 $ 24,492.00 $ 24.00 $ 22,608.00 $ 32.00 $ 30,144.00 $ 23.39 $ 22,033.38 <br />3 12" DIP WATERMAIN CLASS 52 402 LF $ 36.00 $ 14,472.00 $ 35.00 $ 14,070.00 $ 40.00 $ 16,080.00 $ 31.66 $ 12,727.32 <br />4 6" DIP WATER SERVICE CL 52 43 LF $ 25.00 $ 1,075.00 $ 25.00 $ 1,075.00 $ 30.00 $ 1,290.00 $ 20.30 $ 872.90 <br />5 6" DIP WATERMAIN (HYDRANT LEAD) CL 52 62 LF $ 25.00 $ 1,550.00 $ 25.00 $ 1,550.00 $ 30.00 $ 1,860.00 $ 20.30 $ 1,258.60 <br />6 PIPE FITTINGS - ALL SIZES 1,200 LB $ 3.00 $ 3,600.00 $ 3.00 $ 3,600.00 $ 1.70 $ 2,040.00 $ 3.09 $ 3,708.00 <br />7 8" GATE VALVE AND BOX 2 EA $ 900.00 $ 1,800.00 $ 750.00 $ 1,500.00 $ 665.00 $ 1,330.00 $ 848.52 $ 1,697.04 <br />8 12" GATE VALVE AND BOX 1 EA $ 2,000.00 $ 2,000.00 $ 1,200.00 $ 1,200.00 $ 1,191.00 $ 1,191.00 $ 1,361.13 $ 1,361.13 <br />9 NEW "PACER HYDRANT" WB67 -250 4 EA $ 1,900.00 $ 7,600.00 $ 2,100.00 $ 8,400.00 $ 2,053.00 $ 8,212.00 $ 2,353.68 $ 9,414.72 <br />10 1" CORPORATION STOP 12 EA $ 175.00 $ 2,100.00 $ 75.00 $ 900.00 $ 85.00 $ 1,020.00 $ 68.78 $ 825.36 <br />11 1" CURB STOP & BOX 12 EA $ 120.00 $ 1,440.00 $ 75.00 $ 900.00 $ 130.00 $ 1,560.00 $ 168.17 $ 2,018.04 <br />12 1" COPPER SERVICE PIPE (TYPE K) 475 LF $ 12.50 $ 5,937.50 $ 12.00 $ 5,700.00 $ 9.00 $ 4,275.00 $ 16.46 $ 7,818.50 <br />SUBTOTAL DIVISION II $ 67,066.50 $ 63,003.00 $ 70,002.00 $ 64,843.62 <br />Page 1 <br />Page 1 <br />