Laserfiche WebLink
TABULAN OF BIDS <br />MARSHAN LANE UTILITY IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO. 12857 -01 <br />BIDS OPENED: JULY 7, 2004, AT 2:00 PM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />WB MILLER INC REDSTONE CONSTRUCTION VOLK SEWER AND WATER <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />TKDA <br />ENGINEERS- ARCHITECTS• PLANNERS <br />THREE RIVERS CONSTRUCTION <br />UNIT TOTAL <br />PRICE AMOUNT <br />REMOVALS AND RESTORATION <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 14,497.12 <br />$ 14,497.12 <br />$ 5,500.00 <br />$ 5,500.00 <br />$ 3,285.00 <br />$ 3,285.00 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 1,300.00 <br />$ 1,300.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 5,150.00 <br />$ 5,150.00 <br />3 <br />CLEARING AND GRUBBING <br />1 <br />LS <br />$ 20,500.00 <br />$ 20,500.00 <br />$ 9,275.00 <br />$ 9,275.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 6,180.00 <br />$ 6,180.00 <br />4 <br />SALVAGE /RESTORE SIGNS AND MAILBOX SUPPORTS <br />1 <br />LS <br />$ 1,300.00 <br />$ 1,300.00 <br />$ 1,550.00 <br />$ 1,550.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 1,802.50 <br />$ 1,802.50 <br />5 <br />REMOVE CONCRETE CURB AND GUTTER <br />65 <br />LF <br />$ 5.50 <br />$ 357.50 <br />$ 3.50 <br />$ 227.50 <br />$ 10.00 <br />$ 650.00 <br />$ 10.00 <br />$ 650.00 <br />6 <br />REMOVE CONCRETE DRIVEWAY (ALL DEPTHS) <br />75 <br />SY <br />$ 7.00 <br />$ 525.00 <br />$ 15.00 <br />$ 1,125.00 <br />$ 20.00 <br />$ 1,500.00 <br />$ 10.00 <br />$ 750.00 <br />7 <br />REMOVE BIT. DRIVEWAY PAVEMENT (ALL DEPTHS) <br />675 <br />SY <br />$ 3.25 <br />$ 2,193.75 <br />$ 2.50 <br />$ 1,687.50 <br />$ 5.00 <br />$ 3,375.00 <br />$ 7.50 <br />$ 5,062.50 <br />8 <br />REMOVE BIT. STREET PAVEMENT (ALL DEPTHS) <br />2300 <br />SY <br />$ 6.00 <br />$ 13,800.00 <br />$ 2.00 <br />$ 4,600.00 <br />$ 5.00 <br />$ 11,500.00 <br />$ 3.05 <br />$ 7,015.00 <br />9 <br />WATER FOR DUST CONTROL <br />10 <br />PER M <br />$ 47.00 <br />$ 470.00 <br />$ 35.00 <br />$ 350.00 <br />$ 20.00 <br />$ 200.00 <br />$ 103.00 <br />$ 1,030.00 <br />10 <br />SUBGRADE PREPARATION <br />8 <br />RDST <br />$ 300.00 <br />$ 2,400.00 <br />$ 150.00 <br />$ 1,200.00 <br />$ 172.50 <br />$ 1,380.00 <br />$ 150.00 <br />$ 1,200.00 <br />11 <br />COMMON EXCAVATION (STREET /DRWY) <br />1200 <br />CY <br />$ 6.25 <br />$ 7,500.00 <br />$ 9.85 <br />$ 11,820.00 <br />$ 12.00 <br />$ 14,400.00 <br />$ 7.50 <br />$ 9,000.00 <br />12 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) <br />(STREET /DRWY /PATCH) <br />1,160 <br />TON <br />$ 0.10 <br />$ 116.00 <br />$ 13.50 <br />$ 15,660.00 <br />$ 14.95 <br />$ 17,342.00 <br />$ 14.00 <br />$ 16,240.00 <br />13 <br />2" BITUMINOUS PAVEMENT (STREET) <br />(TYPE LV3 WEAR COURSE MIXTURE C) <br />300 <br />TON <br />$ 59.00 <br />$ 17,700.00 <br />$ 42.00 <br />$ 12,600.00 <br />$ 50.60 <br />$ 15,180.00 <br />$ 50.00 <br />$ 15,000.00 <br />14 <br />CONCRETE CURB AND GUTTER <br />65 <br />LF <br />$ 21.00 <br />$ 1,365.00 <br />$ 20.00 <br />$ 1,300.00 <br />$ 23.00 <br />$ 1,495.00 <br />$ 31.00 <br />$ 2,015.00 <br />15 <br />6° CONCRETE DRIVEWAY PAVEMENT <br />75 <br />SY <br />$ 48.00 <br />$ 3,600.00 <br />$ 45.00 <br />$ 3,375.00 <br />$ 51.75 <br />$ 3,881.25 <br />$ 36.05 <br />$ 2,703.75 <br />16 <br />2" BITUMINOUS DRIVEWAY PATCH <br />(TYPE LV4 WEAR COURSE MIXTURE C) <br />675 <br />SY <br />$ 27.85 <br />$ 18,798.75 <br />$ 8.75 <br />$ 5,906.25 <br />$ 9.78 <br />$ 6,601.50 <br />$ 13.00 <br />$ 8,775.00 <br />17 <br />INSTALL MAILBOX SUPPORTS <br />4 <br />EA <br />$ 110.00 <br />$ 440.00 <br />$ 75.00 <br />$ 300.00 <br />$ 500.00 <br />$ 2,000.00 <br />$ 103.00 <br />$ 412.00 <br />18 <br />SILT FENCE <br />700 <br />LF <br />$ 3.00 <br />$ 2,100.00 <br />$ 2.40 <br />$ 1,680.00 <br />$ 3.00 <br />$ 2,100.00 <br />$ 2.00 <br />$ 1,400.00 <br />19 <br />REMOVE AND REPLACE EXISTING STORM SEWER <br />SYSTEM <br />1 <br />LS <br />$ 3,200.00 <br />$ 3,200.00 <br />$ 4,727.63 <br />$ 4,727.63 <br />$ 6,500.00 <br />$ 6,500.00 <br />$ 4,500.00 <br />$ 4,500.00 <br />20 <br />SOD WITH 4" TOP SOIL <br />2200 <br />SY <br />$ 4.25 <br />$ 9,350.00 <br />$ 2.45 <br />$ 5,390.00 <br />$ 6.00 <br />$ 13,200.00 <br />$ 4.50 <br />$ 9,900.00 <br />21 <br />SEEDING W /FERTILIZER, MULCH AND TOPSOIL <br />0.5 <br />AC <br />$ 3,750.00 <br />$ 1,875.00 <br />$ 3,100.00 <br />$ 1,550.00 <br />$ 7,500.00 <br />$ 3,750.00 <br />$ 8,172.00 <br />$ 4,086.00 <br />22 <br />EXPLORATORY DIGGING <br />2 <br />HR <br />$ 100.00 <br />$ 200.00 <br />$ 660.06 <br />$ 1,320.12 <br />$ 500.00 <br />$ 1,000.00 <br />$ 150.00 <br />$ 300.00 <br />SUBTOTAL DIVISION I <br />$ 116,591.00 <br />$ 101,641.12 <br />$ 129,554.75 <br />$ 106,456.75 <br />WATERMAIN CONSTRUCTION <br />1 <br />CONNECT TO EXISTING WATERMAIN <br />1 <br />EA <br />$ 1,450.00 <br />$ 1,450.00 <br />$ 1,019.65 <br />$ 1,019.65 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 3,803.00 <br />$ 3,803.00 <br />2 <br />8" DIP WATERMAIN CLASS 52 <br />942 <br />LF <br />$ 24.60 <br />$ 23,173.20 <br />$ 27.99 <br />$ 26,366.58 <br />$ 30.00 <br />$ 28,260.00 <br />$ 28.00 <br />$ 26,376.00 <br />3 <br />12" DIP WATERMAIN CLASS 52 <br />402 <br />LF <br />$ 33.20 <br />$ 13,346.40 <br />$ 37.81 <br />$ 15,199.62 <br />$ 42.00 <br />$ 16,884.00 <br />$ 35.00 <br />$ 14,070.00 <br />4 <br />6" DIP WATER SERVICE CL 52 <br />43 <br />LF <br />$ 20.50 <br />$ 881.50 <br />$ 26.91 <br />$ 1,157.13 <br />$ 25.00 <br />$ 1,075.00 <br />$ 29.00 <br />$ 1,247.00 <br />5 <br />6" DIP WATERMAIN (HYDRANT LEAD) CL 52 <br />62 <br />LF <br />$ 20.50 <br />$ 1,271.00 <br />$ 26.80 <br />$ 1,661.60 <br />$ 25.00 <br />$ 1,550.00 <br />$ 29.00 <br />$ 1,798.00 <br />6 <br />PIPE FITTINGS - ALL SIZES <br />1,200 <br />LB <br />$ 2.50 <br />$ 3,000.00 <br />$ 2.77 <br />$ 3,324.00 <br />$ 3.00 <br />$ 3,600.00 <br />$ 3.70 <br />$ 4,440.00 <br />7 <br />8" GATE VALVE AND BOX <br />2 <br />EA <br />$ 695.00 <br />$ 1,390.00 <br />$ 1,107.54 <br />$ 2,215.08 <br />$ 901.00 <br />$ 1,802.00 <br />$ 778.00 <br />$ 1,556.00 <br />8 <br />12" GATE VALVE AND BOX <br />1 <br />EA <br />$ 1,200.00 <br />$ 1,200.00 <br />$ 1,882.86 <br />$ 1,882.86 <br />$ 1,443.00 <br />$ 1,443.00 <br />$ 1,355.00 <br />$ 1,355.00 <br />9 <br />NEW "PACER HYDRANT" WB67 -250 <br />4 <br />EA <br />$ 2,000.00 <br />$ 8,000.00 <br />$ 3,348.19 <br />$ 13,392.76 <br />$ 2,178.00 <br />$ 8,712.00 <br />$ 2,450.00 <br />$ 9,800.00 <br />10 <br />1" CORPORATION STOP <br />12 <br />EA <br />$ 37.00 <br />$ 444.00 <br />$ 169.25 <br />$ 2,031.00 <br />$ 185.00 <br />$ 2,220.00 <br />$ 30.00 <br />$ 360.00 <br />11 <br />1" CURB STOP & BOX <br />12 <br />EA <br />$ 80.00 <br />$ 960.00 <br />$ 233.64 <br />$ 2,803.68 <br />$ 425.00 <br />$ 5,100.00 <br />$ 81.00 <br />$ 972.00 <br />12 <br />1" COPPER SERVICE PIPE (TYPE K) <br />475 <br />LF <br />$ 14.50 <br />$ 6,887.50 <br />$ 13.88 <br />$ 6,593.00 <br />$ 21.00 <br />$ 9,975.00 <br />$ 18.00 <br />$ 8,550.00 <br />SUBTOTAL DIVISION 11 <br />$ 62,003.60 <br />$ 77,646.96 <br />$ 81,621.00 <br />$ 74,327.00 <br />Page 3 <br />