TABULAN OF BIDS
<br />MARSHAN LANE UTILITY IMPROVEMENTS
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA COMMISSION NO. 12857 -01
<br />BIDS OPENED: JULY 7, 2004, AT 2:00 PM
<br />*DENOTES ERROR IN BIDDERS CALCULATION
<br />WB MILLER INC REDSTONE CONSTRUCTION VOLK SEWER AND WATER
<br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br />TKDA
<br />ENGINEERS- ARCHITECTS• PLANNERS
<br />THREE RIVERS CONSTRUCTION
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />REMOVALS AND RESTORATION
<br />1
<br />MOBILIZATION
<br />1
<br />LS
<br />$ 7,500.00
<br />$ 7,500.00
<br />$ 14,497.12
<br />$ 14,497.12
<br />$ 5,500.00
<br />$ 5,500.00
<br />$ 3,285.00
<br />$ 3,285.00
<br />2
<br />TRAFFIC CONTROL
<br />1
<br />LS
<br />$ 1,300.00
<br />$ 1,300.00
<br />$ 1,500.00
<br />$ 1,500.00
<br />$ 3,500.00
<br />$ 3,500.00
<br />$ 5,150.00
<br />$ 5,150.00
<br />3
<br />CLEARING AND GRUBBING
<br />1
<br />LS
<br />$ 20,500.00
<br />$ 20,500.00
<br />$ 9,275.00
<br />$ 9,275.00
<br />$ 12,000.00
<br />$ 12,000.00
<br />$ 6,180.00
<br />$ 6,180.00
<br />4
<br />SALVAGE /RESTORE SIGNS AND MAILBOX SUPPORTS
<br />1
<br />LS
<br />$ 1,300.00
<br />$ 1,300.00
<br />$ 1,550.00
<br />$ 1,550.00
<br />$ 2,500.00
<br />$ 2,500.00
<br />$ 1,802.50
<br />$ 1,802.50
<br />5
<br />REMOVE CONCRETE CURB AND GUTTER
<br />65
<br />LF
<br />$ 5.50
<br />$ 357.50
<br />$ 3.50
<br />$ 227.50
<br />$ 10.00
<br />$ 650.00
<br />$ 10.00
<br />$ 650.00
<br />6
<br />REMOVE CONCRETE DRIVEWAY (ALL DEPTHS)
<br />75
<br />SY
<br />$ 7.00
<br />$ 525.00
<br />$ 15.00
<br />$ 1,125.00
<br />$ 20.00
<br />$ 1,500.00
<br />$ 10.00
<br />$ 750.00
<br />7
<br />REMOVE BIT. DRIVEWAY PAVEMENT (ALL DEPTHS)
<br />675
<br />SY
<br />$ 3.25
<br />$ 2,193.75
<br />$ 2.50
<br />$ 1,687.50
<br />$ 5.00
<br />$ 3,375.00
<br />$ 7.50
<br />$ 5,062.50
<br />8
<br />REMOVE BIT. STREET PAVEMENT (ALL DEPTHS)
<br />2300
<br />SY
<br />$ 6.00
<br />$ 13,800.00
<br />$ 2.00
<br />$ 4,600.00
<br />$ 5.00
<br />$ 11,500.00
<br />$ 3.05
<br />$ 7,015.00
<br />9
<br />WATER FOR DUST CONTROL
<br />10
<br />PER M
<br />$ 47.00
<br />$ 470.00
<br />$ 35.00
<br />$ 350.00
<br />$ 20.00
<br />$ 200.00
<br />$ 103.00
<br />$ 1,030.00
<br />10
<br />SUBGRADE PREPARATION
<br />8
<br />RDST
<br />$ 300.00
<br />$ 2,400.00
<br />$ 150.00
<br />$ 1,200.00
<br />$ 172.50
<br />$ 1,380.00
<br />$ 150.00
<br />$ 1,200.00
<br />11
<br />COMMON EXCAVATION (STREET /DRWY)
<br />1200
<br />CY
<br />$ 6.25
<br />$ 7,500.00
<br />$ 9.85
<br />$ 11,820.00
<br />$ 12.00
<br />$ 14,400.00
<br />$ 7.50
<br />$ 9,000.00
<br />12
<br />AGGREGATE BASE CLASS 5 (100% CRUSHED)
<br />(STREET /DRWY /PATCH)
<br />1,160
<br />TON
<br />$ 0.10
<br />$ 116.00
<br />$ 13.50
<br />$ 15,660.00
<br />$ 14.95
<br />$ 17,342.00
<br />$ 14.00
<br />$ 16,240.00
<br />13
<br />2" BITUMINOUS PAVEMENT (STREET)
<br />(TYPE LV3 WEAR COURSE MIXTURE C)
<br />300
<br />TON
<br />$ 59.00
<br />$ 17,700.00
<br />$ 42.00
<br />$ 12,600.00
<br />$ 50.60
<br />$ 15,180.00
<br />$ 50.00
<br />$ 15,000.00
<br />14
<br />CONCRETE CURB AND GUTTER
<br />65
<br />LF
<br />$ 21.00
<br />$ 1,365.00
<br />$ 20.00
<br />$ 1,300.00
<br />$ 23.00
<br />$ 1,495.00
<br />$ 31.00
<br />$ 2,015.00
<br />15
<br />6° CONCRETE DRIVEWAY PAVEMENT
<br />75
<br />SY
<br />$ 48.00
<br />$ 3,600.00
<br />$ 45.00
<br />$ 3,375.00
<br />$ 51.75
<br />$ 3,881.25
<br />$ 36.05
<br />$ 2,703.75
<br />16
<br />2" BITUMINOUS DRIVEWAY PATCH
<br />(TYPE LV4 WEAR COURSE MIXTURE C)
<br />675
<br />SY
<br />$ 27.85
<br />$ 18,798.75
<br />$ 8.75
<br />$ 5,906.25
<br />$ 9.78
<br />$ 6,601.50
<br />$ 13.00
<br />$ 8,775.00
<br />17
<br />INSTALL MAILBOX SUPPORTS
<br />4
<br />EA
<br />$ 110.00
<br />$ 440.00
<br />$ 75.00
<br />$ 300.00
<br />$ 500.00
<br />$ 2,000.00
<br />$ 103.00
<br />$ 412.00
<br />18
<br />SILT FENCE
<br />700
<br />LF
<br />$ 3.00
<br />$ 2,100.00
<br />$ 2.40
<br />$ 1,680.00
<br />$ 3.00
<br />$ 2,100.00
<br />$ 2.00
<br />$ 1,400.00
<br />19
<br />REMOVE AND REPLACE EXISTING STORM SEWER
<br />SYSTEM
<br />1
<br />LS
<br />$ 3,200.00
<br />$ 3,200.00
<br />$ 4,727.63
<br />$ 4,727.63
<br />$ 6,500.00
<br />$ 6,500.00
<br />$ 4,500.00
<br />$ 4,500.00
<br />20
<br />SOD WITH 4" TOP SOIL
<br />2200
<br />SY
<br />$ 4.25
<br />$ 9,350.00
<br />$ 2.45
<br />$ 5,390.00
<br />$ 6.00
<br />$ 13,200.00
<br />$ 4.50
<br />$ 9,900.00
<br />21
<br />SEEDING W /FERTILIZER, MULCH AND TOPSOIL
<br />0.5
<br />AC
<br />$ 3,750.00
<br />$ 1,875.00
<br />$ 3,100.00
<br />$ 1,550.00
<br />$ 7,500.00
<br />$ 3,750.00
<br />$ 8,172.00
<br />$ 4,086.00
<br />22
<br />EXPLORATORY DIGGING
<br />2
<br />HR
<br />$ 100.00
<br />$ 200.00
<br />$ 660.06
<br />$ 1,320.12
<br />$ 500.00
<br />$ 1,000.00
<br />$ 150.00
<br />$ 300.00
<br />SUBTOTAL DIVISION I
<br />$ 116,591.00
<br />$ 101,641.12
<br />$ 129,554.75
<br />$ 106,456.75
<br />WATERMAIN CONSTRUCTION
<br />1
<br />CONNECT TO EXISTING WATERMAIN
<br />1
<br />EA
<br />$ 1,450.00
<br />$ 1,450.00
<br />$ 1,019.65
<br />$ 1,019.65
<br />$ 1,000.00
<br />$ 1,000.00
<br />$ 3,803.00
<br />$ 3,803.00
<br />2
<br />8" DIP WATERMAIN CLASS 52
<br />942
<br />LF
<br />$ 24.60
<br />$ 23,173.20
<br />$ 27.99
<br />$ 26,366.58
<br />$ 30.00
<br />$ 28,260.00
<br />$ 28.00
<br />$ 26,376.00
<br />3
<br />12" DIP WATERMAIN CLASS 52
<br />402
<br />LF
<br />$ 33.20
<br />$ 13,346.40
<br />$ 37.81
<br />$ 15,199.62
<br />$ 42.00
<br />$ 16,884.00
<br />$ 35.00
<br />$ 14,070.00
<br />4
<br />6" DIP WATER SERVICE CL 52
<br />43
<br />LF
<br />$ 20.50
<br />$ 881.50
<br />$ 26.91
<br />$ 1,157.13
<br />$ 25.00
<br />$ 1,075.00
<br />$ 29.00
<br />$ 1,247.00
<br />5
<br />6" DIP WATERMAIN (HYDRANT LEAD) CL 52
<br />62
<br />LF
<br />$ 20.50
<br />$ 1,271.00
<br />$ 26.80
<br />$ 1,661.60
<br />$ 25.00
<br />$ 1,550.00
<br />$ 29.00
<br />$ 1,798.00
<br />6
<br />PIPE FITTINGS - ALL SIZES
<br />1,200
<br />LB
<br />$ 2.50
<br />$ 3,000.00
<br />$ 2.77
<br />$ 3,324.00
<br />$ 3.00
<br />$ 3,600.00
<br />$ 3.70
<br />$ 4,440.00
<br />7
<br />8" GATE VALVE AND BOX
<br />2
<br />EA
<br />$ 695.00
<br />$ 1,390.00
<br />$ 1,107.54
<br />$ 2,215.08
<br />$ 901.00
<br />$ 1,802.00
<br />$ 778.00
<br />$ 1,556.00
<br />8
<br />12" GATE VALVE AND BOX
<br />1
<br />EA
<br />$ 1,200.00
<br />$ 1,200.00
<br />$ 1,882.86
<br />$ 1,882.86
<br />$ 1,443.00
<br />$ 1,443.00
<br />$ 1,355.00
<br />$ 1,355.00
<br />9
<br />NEW "PACER HYDRANT" WB67 -250
<br />4
<br />EA
<br />$ 2,000.00
<br />$ 8,000.00
<br />$ 3,348.19
<br />$ 13,392.76
<br />$ 2,178.00
<br />$ 8,712.00
<br />$ 2,450.00
<br />$ 9,800.00
<br />10
<br />1" CORPORATION STOP
<br />12
<br />EA
<br />$ 37.00
<br />$ 444.00
<br />$ 169.25
<br />$ 2,031.00
<br />$ 185.00
<br />$ 2,220.00
<br />$ 30.00
<br />$ 360.00
<br />11
<br />1" CURB STOP & BOX
<br />12
<br />EA
<br />$ 80.00
<br />$ 960.00
<br />$ 233.64
<br />$ 2,803.68
<br />$ 425.00
<br />$ 5,100.00
<br />$ 81.00
<br />$ 972.00
<br />12
<br />1" COPPER SERVICE PIPE (TYPE K)
<br />475
<br />LF
<br />$ 14.50
<br />$ 6,887.50
<br />$ 13.88
<br />$ 6,593.00
<br />$ 21.00
<br />$ 9,975.00
<br />$ 18.00
<br />$ 8,550.00
<br />SUBTOTAL DIVISION 11
<br />$ 62,003.60
<br />$ 77,646.96
<br />$ 81,621.00
<br />$ 74,327.00
<br />Page 3