TABULAITON OF BIDS
<br />MARSHAN LANE UTILITY IMPROVEMENTS
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA COMMISSION NO. 12857 -01
<br />BIDS OPENED: JULY 7, 2004, AT 2:00 PM
<br />'DENOTES ERROR IN BIDDERS CALCULATION
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />TKDA
<br />ENGINEERS • ARCHITECTS - PLANNERS
<br />LAMETTI & SONS INC
<br />UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br />QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br />REMOVALS AND RESTORATION
<br />MOBILIZATION
<br />LS
<br />$ 32,000.00 $ 32,000.00
<br />TRAFFIC CONTROL
<br />LS
<br />$ 2,000.00 $ 2,000.00
<br />3
<br />CLEARING AND GRUBBING
<br />LS
<br />$ 13,000.00 $ 13,000.00
<br />4
<br />SALVAGE/RESTORE SIGNS AND MAILBOX SUPPORTS
<br />LS
<br />$ 2,000.00 $ 2,000.00
<br />$
<br />5
<br />REMOVE CONCRETE CURB AND GUTTER
<br />65
<br />LF
<br />$ 10.00 $ 650.00
<br />6
<br />REMOVE CONCRETE DRIVEWAY (ALL DEPTHS)
<br />75
<br />SY
<br />$ 12.00 $ 900.00
<br />7
<br />REMOVE BIT. DRIVEWAY PAVEMENT (ALL DEPTHS)
<br />675
<br />SY
<br />$ 3.00 $ 2,025.00
<br />8
<br />REMOVE BIT. STREET PAVEMENT (ALL DEPTHS)
<br />2300
<br />SY
<br />$ 4.00 $ 9,200.00
<br />9
<br />WATER FOR DUST CONTROL
<br />10
<br />PER M
<br />$ 50.00 $ 500.00
<br />10
<br />SUBGRADE PREPARATION
<br />8
<br />RDST
<br />$ 200.00 $ 1,600.00
<br />11
<br />COMMON EXCAVATION (STREET /DRWY)
<br />1200
<br />CY
<br />$ 5.00 $ 6,000.00
<br />$
<br />12
<br />AGGREGATE BASE CLASS 5 (100% CRUSHED)
<br />(STREET /DRWY /PATCH)
<br />1,160
<br />TON
<br />$ 13.00 $ 15,080.00
<br />13
<br />2" BITUMINOUS PAVEMENT (STREET)
<br />(TYPE LV3 WEAR COURSE MIXTURE C)
<br />300
<br />TON
<br />$ 44.00 $ 13,200.00
<br />14
<br />CONCRETE CURB AND GUTTER
<br />65
<br />LF
<br />$ 20.00 $ 1,300.00
<br />15
<br />6" CONCRETE DRIVEWAY PAVEMENT
<br />75
<br />SY
<br />$ 45.00 $ 3,375.00
<br />16
<br />2" BITUMINOUS DRIVEWAY PATCH
<br />(TYPE LV4 WEAR COURSE MIXTURE C)
<br />675
<br />SY
<br />$ 8.50 $ 5,737.50
<br />17
<br />INSTALL MAILBOX SUPPORTS
<br />4
<br />EA
<br />$ 75.00 $ 300.00
<br />18
<br />SILT FENCE
<br />700
<br />LF
<br />$ 2.00 $ 1,400.00
<br />19
<br />REMOVE AND REPLACE EXISTING STORM SEWER
<br />SYSTEM
<br />LS
<br />20
<br />SOD WITH 4" TOP SOIL
<br />2200
<br />21
<br />22
<br />SEEDING W /FERTILIZER, MULCH AND TOPSOIL
<br />EXPLORATORY DIGGING
<br />0.5
<br />2
<br />SY
<br />AC
<br />HR
<br />$ 9,000.00 $ 9,000.00
<br />$ 6.00 $ 13,200.00
<br />$ 7,500.00 $ 3,750.00
<br />$ 250.00 $ 500.00
<br />SUBTOTAL DIVISION I
<br />$ 136,717.50
<br />WATERMAIN CONSTRUCTION
<br />CONNECT TO EXISTING WATERMAIN
<br />EA
<br />$ 1,500.00 $ 1,500.00
<br />2
<br />8" DIP WATERMAIN CLASS 52
<br />942
<br />LF
<br />$ 30.00 $ 28,260.00
<br />3
<br />12" DIP WATERMAIN CLASS 52
<br />402
<br />LF
<br />$ 45.00 $ 18,090.00
<br />4
<br />6" DIP WATER SERVICE CL 52
<br />43
<br />LF
<br />$ 36.00 $ 1,548.00
<br />5
<br />6" DIP WATERMAIN (HYDRANT LEAD) CL 52
<br />62
<br />6
<br />PIPE FITTINGS - ALL SIZES
<br />1,200
<br />LF
<br />LB
<br />$ 40.00 $ 2,480.00
<br />$ 3.50 $ 4,200.00
<br />7
<br />8" GATE VALVE AND BOX
<br />2
<br />EA
<br />$ 1,000.00 $ 2,000.00
<br />8
<br />12" GATE VALVE AND BOX
<br />EA
<br />$ 2,000.00 $ 2,000.00
<br />9
<br />NEW "PACER HYDRANT" WB67 -250
<br />4
<br />EA
<br />$ 3,500.00 $ 14,000.00
<br />10
<br />1" CORPORATION STOP
<br />12
<br />EA
<br />$ 250.00 $ 3,000.00
<br />11
<br />1" CURB STOP & BOX
<br />12
<br />EA
<br />$ 350.00 $ 4,200.00
<br />12
<br />1" COPPER SERVICE PIPE (TYPE K)
<br />475
<br />LF
<br />$ 15.00 $ 7,125.00
<br />SUBTOTAL DIVISION II
<br />$ 88,403.00
<br />$
<br />Page 5
<br />
|