Laserfiche WebLink
TABULAITON OF BIDS <br />MARSHAN LANE UTILITY IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO. 12857 -01 <br />BIDS OPENED: JULY 7, 2004, AT 2:00 PM <br />'DENOTES ERROR IN BIDDERS CALCULATION <br />ITEM <br />NO. <br />DESCRIPTION <br />TKDA <br />ENGINEERS • ARCHITECTS - PLANNERS <br />LAMETTI & SONS INC <br />UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />REMOVALS AND RESTORATION <br />MOBILIZATION <br />LS <br />$ 32,000.00 $ 32,000.00 <br />TRAFFIC CONTROL <br />LS <br />$ 2,000.00 $ 2,000.00 <br />3 <br />CLEARING AND GRUBBING <br />LS <br />$ 13,000.00 $ 13,000.00 <br />4 <br />SALVAGE/RESTORE SIGNS AND MAILBOX SUPPORTS <br />LS <br />$ 2,000.00 $ 2,000.00 <br />$ <br />5 <br />REMOVE CONCRETE CURB AND GUTTER <br />65 <br />LF <br />$ 10.00 $ 650.00 <br />6 <br />REMOVE CONCRETE DRIVEWAY (ALL DEPTHS) <br />75 <br />SY <br />$ 12.00 $ 900.00 <br />7 <br />REMOVE BIT. DRIVEWAY PAVEMENT (ALL DEPTHS) <br />675 <br />SY <br />$ 3.00 $ 2,025.00 <br />8 <br />REMOVE BIT. STREET PAVEMENT (ALL DEPTHS) <br />2300 <br />SY <br />$ 4.00 $ 9,200.00 <br />9 <br />WATER FOR DUST CONTROL <br />10 <br />PER M <br />$ 50.00 $ 500.00 <br />10 <br />SUBGRADE PREPARATION <br />8 <br />RDST <br />$ 200.00 $ 1,600.00 <br />11 <br />COMMON EXCAVATION (STREET /DRWY) <br />1200 <br />CY <br />$ 5.00 $ 6,000.00 <br />$ <br />12 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) <br />(STREET /DRWY /PATCH) <br />1,160 <br />TON <br />$ 13.00 $ 15,080.00 <br />13 <br />2" BITUMINOUS PAVEMENT (STREET) <br />(TYPE LV3 WEAR COURSE MIXTURE C) <br />300 <br />TON <br />$ 44.00 $ 13,200.00 <br />14 <br />CONCRETE CURB AND GUTTER <br />65 <br />LF <br />$ 20.00 $ 1,300.00 <br />15 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />75 <br />SY <br />$ 45.00 $ 3,375.00 <br />16 <br />2" BITUMINOUS DRIVEWAY PATCH <br />(TYPE LV4 WEAR COURSE MIXTURE C) <br />675 <br />SY <br />$ 8.50 $ 5,737.50 <br />17 <br />INSTALL MAILBOX SUPPORTS <br />4 <br />EA <br />$ 75.00 $ 300.00 <br />18 <br />SILT FENCE <br />700 <br />LF <br />$ 2.00 $ 1,400.00 <br />19 <br />REMOVE AND REPLACE EXISTING STORM SEWER <br />SYSTEM <br />LS <br />20 <br />SOD WITH 4" TOP SOIL <br />2200 <br />21 <br />22 <br />SEEDING W /FERTILIZER, MULCH AND TOPSOIL <br />EXPLORATORY DIGGING <br />0.5 <br />2 <br />SY <br />AC <br />HR <br />$ 9,000.00 $ 9,000.00 <br />$ 6.00 $ 13,200.00 <br />$ 7,500.00 $ 3,750.00 <br />$ 250.00 $ 500.00 <br />SUBTOTAL DIVISION I <br />$ 136,717.50 <br />WATERMAIN CONSTRUCTION <br />CONNECT TO EXISTING WATERMAIN <br />EA <br />$ 1,500.00 $ 1,500.00 <br />2 <br />8" DIP WATERMAIN CLASS 52 <br />942 <br />LF <br />$ 30.00 $ 28,260.00 <br />3 <br />12" DIP WATERMAIN CLASS 52 <br />402 <br />LF <br />$ 45.00 $ 18,090.00 <br />4 <br />6" DIP WATER SERVICE CL 52 <br />43 <br />LF <br />$ 36.00 $ 1,548.00 <br />5 <br />6" DIP WATERMAIN (HYDRANT LEAD) CL 52 <br />62 <br />6 <br />PIPE FITTINGS - ALL SIZES <br />1,200 <br />LF <br />LB <br />$ 40.00 $ 2,480.00 <br />$ 3.50 $ 4,200.00 <br />7 <br />8" GATE VALVE AND BOX <br />2 <br />EA <br />$ 1,000.00 $ 2,000.00 <br />8 <br />12" GATE VALVE AND BOX <br />EA <br />$ 2,000.00 $ 2,000.00 <br />9 <br />NEW "PACER HYDRANT" WB67 -250 <br />4 <br />EA <br />$ 3,500.00 $ 14,000.00 <br />10 <br />1" CORPORATION STOP <br />12 <br />EA <br />$ 250.00 $ 3,000.00 <br />11 <br />1" CURB STOP & BOX <br />12 <br />EA <br />$ 350.00 $ 4,200.00 <br />12 <br />1" COPPER SERVICE PIPE (TYPE K) <br />475 <br />LF <br />$ 15.00 $ 7,125.00 <br />SUBTOTAL DIVISION II <br />$ 88,403.00 <br />$ <br />Page 5 <br />