Laserfiche WebLink
TABULAON OF BIDS w <br />BIRCH STREET AND HODGSON ROAD IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12993 -01 <br />BIDS OPENED: JULY 29, 2004, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEERS ESTIMATE CENTRAL LANDSCAPING <br />TEM UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />■ <br />���� <br />ENGINEERS • ARCHITECTS • PLANNERS <br />JAY BROS., INC. <br />UNIT TOTAL <br />PRICE AMOUNT <br />BIRCH STREET AND HODGSON ROAD IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 30,000.00 <br />$ 30,000.00 <br />$ 23,000.00 <br />$ 23,000.00 <br />$ 19,925.00 <br />$ 19,925.00 <br />2 <br />CLEARING <br />59 <br />TR <br />$ 150.00 <br />$ 8,850.00 <br />$ 150.00 <br />$ 8,850.00 <br />$ 100.00 <br />$ 5,900.00 <br />3 <br />GRUBBING <br />61 <br />TR <br />$ 65.00 <br />$ 3,965.00 <br />$ 150.00 <br />$ 9,150.00 <br />$ 100.00 <br />$ 6,100.00 <br />4 <br />REMOVE FENCE <br />55 <br />LF <br />$ 2.00 <br />$ 110.00 <br />$ 1:00 <br />$ 55.00 <br />$ 7.00 <br />$ 385.00 <br />5 <br />REMOVE CONCRETE CURB <br />430 <br />LF <br />$ 3.00 <br />$ 1,290.00 <br />$ 4.00 <br />$ 1,720.00 <br />$ 6.00 <br />$ 2,580.00 <br />6 <br />REMOVE STORM SEWER PIPE (ALL TYPES & SIZES) <br />56 <br />LF <br />$ 11.00 <br />$ 616.00 <br />$ 12.00 <br />$ 672.00 <br />$ 6.00 <br />$ , 336.00 <br />7 <br />REMOVE WOODEN LANDSCAPING POST <br />10 <br />EA <br />$ 12.00 <br />$ 120.00 <br />$ 20.00 <br />$ 200.00 <br />$ 20.00 <br />$ 200.00 <br />8 <br />REMOVE BIT SURFACE - STREET /DWYITRAIL/SHOULDER (ALL <br />DEPTHS) <br />6,628 <br />SY <br />$ 2.00 <br />$ 13,256.00 <br />$ 1.70 <br />$ 11,267.60 <br />$ 3.50 <br />$ 23,198.00 <br />9 <br />MILL 2" BITUMINOUS - STREET <br />1,311 <br />SY <br />$ 4.00 <br />$ 5,244.00 <br />$ 3.50 <br />$ 4,588.50 <br />$ 1.00 <br />$ 1,311.00 <br />10 <br />REMOVE CATCH BASIN, MANHOLE <br />5 <br />EA <br />$ 400.00 <br />$ 2,000.00 <br />$ 300.00 <br />$ 1,500.00 <br />$ 300.00 <br />$ 1,500.00 <br />11 <br />SAW CUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />5,524 <br />LF <br />$ 2.00 <br />$ 11,048.00 <br />$ 1.80 <br />$ 9,943.20 <br />$ 3.00 <br />$ 16,572.00 <br />2 <br />SALVAGE AND REINSTALL MAILBOX SUPPORT <br />7 <br />EA <br />$ 150.00 <br />$ 1,050.00 <br />$ 90.00 <br />$ 630.00 <br />$ 150.00 <br />$ 1,050.00 <br />3 <br />SALVAGE AND RELOCATE HYDRANT & GATE VALVE SYSTEM <br />1 <br />LS <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 1,850.00 <br />$ 1,850.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />.4 <br />SALVAGE AND REINSTALL 12" PIPE SEWER CMP <br />37 <br />LF <br />. $ 25.00 <br />$ 925.00 <br />$ 18.00 <br />$ 666.00 <br />$ 40.00 <br />$ 1,480.00 <br />15 <br />SALVAGE AND REINSTALL 15" RCP <br />61 <br />LF <br />$ 25.00 <br />$ 1,525.00 <br />$ 21.00 <br />$ 1,281.00 <br />$ 40.00 <br />$ 2,440.00 <br />16 <br />SALVAGE AND REINSTALL 15" FES (RCP) <br />3 <br />EA <br />$ 500.00 <br />$ 1,500.00 <br />$ 1,000.00 <br />$ 3,000.00 <br />$ 190.00 <br />$ 570.00 <br />17 <br />SALVAGE AND REINSTALL 24" FES (RCP) <br />1 <br />EA <br />$ 500.00 <br />$ 500.00 <br />$ 1,300.00 <br />$ 1,300.00 <br />$ 200.00 <br />$ 200.00 <br />18 <br />COMMON EXCAVATION (P) (STREET/DRIVEWAY) <br />5,780 <br />CY <br />$ 12.00 <br />$ 69,360.00 <br />$ 7.00 <br />$ 40,460.00 <br />$ 6.20 <br />$ 35,836.00 <br />19 <br />COMMON EXCAVATION (P) FOR TRAIL <br />840 <br />CY <br />$ 12.00 <br />$ 10,080.00 <br />$ 9.00 <br />$ 7,560.00 <br />$ 7.05 <br />$ 5,922.00 <br />20 <br />SUBGRADE EXCAVATION <br />700 <br />CY <br />$ 12.00 <br />$ 8,400.00 <br />$ 7.00 <br />$ 4,900.00 <br />$ 6.50 <br />$ 4,550.00 <br />21 <br />SELECT GRANULAR BORROW (CV) (P) <br />700 <br />CY <br />$ 11.00 <br />$ 7,700.00 <br />$ 13.00 <br />$ 9,100.00 <br />$ 10.00 <br />$ 7,000.00 <br />22 <br />TOPSOIL BORROW (LV) <br />2,100 <br />CY <br />$ 9.00 <br />$ 18,900.00 <br />$ 7.00 <br />$ 14,700.00 <br />$ 9.00 <br />$ 18,900.00 <br />23 <br />CRUSHED ROCK -6" DEPTH (TRENCH STABILIZATION) <br />100 <br />LF <br />$ 3.00 <br />$ 300.00 <br />$ 4.00 <br />$ 400.00 <br />$ 5.60 <br />$ 560.00 <br />24 <br />EXPLORATORY DIGGING <br />5 <br />HR <br />$ 300.00 <br />$ 1,500.00 <br />$ 450.00 <br />$ 2,250.00 <br />$ 125.00 <br />$ 625.00 <br />25 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) (STREET, <br />DRIVEWAY) <br />6,050 <br />TN <br />$ 12.00 <br />$ 72,600.00 <br />$ 11.00 <br />$ 66,550.00 <br />$ 12.00 <br />$ 72,600.00 <br />26 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) F019 TRAIL <br />1,123 <br />TN <br />$ 13.00 <br />$ 14,599.00 <br />$ 12.75 <br />$ 14,318.25 <br />$ 16.50 <br />$ 18,529.50 <br />27 <br />TYPE MV AGG. 3 WEARING COURSE (C.S.A.H. 10, C.S.A.H. 49) <br />1,224 <br />TN <br />$ 42.00 <br />$ 51,408.00 <br />$ 39.80 <br />$ 48,715.20 <br />$ 41.78 <br />$ 51,138.72 <br />28 <br />8 PE MVAGG. 3NON- WEARING COURSE (C.S.A.H. 10, C.S.A.H. <br />1,809 <br />TN <br />$ 41.00 <br />$ 74,169.00 <br />$ 37.25 <br />$ 67,385.25 <br />$ 39.10 <br />$ 70,731.90 <br />29 <br />TYPE LV AGG. 3 WEARING COURSE (WARE RD) <br />230 <br />TN <br />$ 43.00 <br />$ 9,890.00 <br />$ 36.90 <br />$ 8,487.00 <br />$ 38.72 <br />$ 8,905.60 <br />30 <br />TYPE LV AGG. 3NON- WEARING COURSE (WARE RD, <br />COMMERCIAL DWYS) <br />253 <br />TN <br />$ 43.00 <br />$ 10,879.00 <br />$ 42.40 <br />$ 10,727.20 <br />$ 44.52 <br />$ 11,263.56 <br />31 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR TRAIL <br />324 <br />TN <br />$ 55.00 <br />$ 17,820.00 <br />$ 42.90 <br />$ 13,899.60 <br />$ 45.04 <br />$ 14,592.96 <br />32 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAY <br />400 <br />SY <br />$ 12.00 <br />$ 4,800.00 <br />$ 15.75 <br />$ 6,300.00 <br />$ 11.28 <br />$ 4,512.00 <br />33 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />1,100 <br />GAL <br />$ 2.00 <br />$ 2,200.00 <br />$ 2.50 <br />$ 2,750.00 <br />$ 2.60 <br />$ 2,860.00 <br />34 <br />CONNECT TO EXISTING STORM SEWER PIPE (ALL SIZES AND <br />TYPES) <br />5 <br />EA <br />$ 500.00 <br />$ 2,500.00 <br />$ 1,100.00 <br />$ 5,500.00 <br />$ 900.00 <br />$ 4,500.00 <br />35 <br />12" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 800.00 <br />$ 800.00 <br />$ 790.00 <br />$ 790.00 <br />$ 620.00 <br />$ 620.00 <br />36 <br />18" RC PIPE APRON W/ TRASH GUARD <br />5 <br />EA <br />$ 950.00 <br />$ 4,750.00 <br />$ 1,070.00 <br />$ 5,350.00 <br />$ 780.00 <br />$ 3,900.00 <br />37 <br />12° RC PIPE SEWER CLASS V DESIGN 3006 <br />63 <br />LF <br />$ 39.00 <br />$ 2,457.00 <br />$ 28.00 <br />$ 1,764.00 <br />$ 32.00 <br />$ 2,016.00 <br />Page 1 <br />