Laserfiche WebLink
TABULAIRbN OF BIDS <br />BIRCH STREET AND HODGSON ROAD IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12993 -01 <br />BIDS OPENED: JULY 29, 2004, AT 10:00 AM <br />"DENOTES ERROR IN BIDDERS CALCULATION UNIVERSAL ENTERPRISES <br />OF MID - MINNESOTA W.B. MILLER, INC. <br />TEM UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />���� <br />ENGINEERS • ARCHITECTS • PLANNERS <br />UNIT TOTAL <br />PRICE AMOUNT <br />BIRCH STREET AND HODGSON ROAD IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 30,000.00 <br />$ 30,000.00 <br />$ - <br />2 <br />CLEARING <br />59 <br />TR <br />$ 100.00 <br />$ 5,900.00 <br />$ 100.00 <br />$ 5,900.00 <br />$ - <br />3 <br />GRUBBING <br />61 <br />TR <br />$ 100.00 <br />$ 6,100.00 <br />$ 90.00 <br />$ 5,490.00 <br />$ - <br />4 <br />REMOVE FENCE <br />55 <br />LF <br />$ 8.00 <br />$ 440.00 <br />$ 10.50 <br />$ 577.50 <br />$ - <br />5 <br />REMOVE CONCRETE CURB <br />430 <br />LF <br />$ 7.00 <br />$ 3,010.00 <br />$ 5.00 <br />$ 2,150.00 <br />$ - <br />6 <br />REMOVE STORM SEWER PIPE (ALL TYPES & SIZES) <br />56 <br />LF <br />$ 7.00 <br />$ 392.00 <br />$ 21.00 <br />$ 1,176.00 <br />$ - <br />7 <br />REMOVE WOODEN LANDSCAPING POST <br />10 <br />EA <br />$ 22.00 <br />$ 220.00 <br />$ 35.00 <br />$ 350.00 <br />$ - <br />8 <br />REMOVE BIT SURFACE - STREET /DWY/TRAIUSHOULDER (ALL <br />DEPTHS) <br />6,628 <br />SY <br />$ 4.00 <br />$ 26,512.00 <br />$ 4.00 <br />$ 26,512.00 <br />$ <br />9 <br />MILL 2" BITUMINOUS - STREET <br />1,311 <br />SY <br />$ 1.50 <br />$ 1,966.50 <br />$ 4.20 <br />$ 5,506.20 <br />$ - <br />10 <br />REMOVE CATCH BASIN, MANHOLE <br />5 <br />EA <br />$ 305.00 <br />$ 1,525.00 <br />$ 370.00 <br />$ 1,850.00 <br />$ - <br />1 '1 <br />SAW CUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />5,524 <br />LF <br />$ 2.25 <br />$ 12,429.00 <br />$ 2.50 <br />$ 13,810.00 <br />$ - <br />01 2 <br />SALVAGE AND REINSTALL MAILBOX SUPPORT <br />7 <br />EA <br />$ 155.00 <br />$ 1,085.00 <br />$ 110.00 <br />$ 770.00 <br />$ - <br />W 3 <br />SALVAGE AND RELOCATE HYDRANT & GATE VALVE SYSTEM <br />1 <br />LS <br />$ 1,250.00 <br />$ 1,250.00 <br />$ 3,900.00 <br />$ 3,900.00 <br />$ - <br />.4 <br />SALVAGE AND REINSTALL 12" PIPE SEWER CMP <br />37 <br />LF <br />$ 42.00 <br />$ 1,554.00 <br />$ 37.00 <br />$ 1,369.00 <br />$ - <br />15 <br />SALVAGE AND REINSTALL 15" RCP <br />61 <br />LF <br />$ 42.00 <br />$ 2,562.00 <br />$ 37.00 <br />$ 2,257.00 <br />$ - <br />16 <br />SALVAGE AND REINSTALL 15" FES (RCP) <br />3 <br />EA <br />$ 192.00 <br />$ 576.00 <br />$ 790.00 <br />$ 2,370.00 <br />$ - <br />17 <br />SALVAGE AND REINSTALL 24" FES (RCP) <br />1 <br />EA <br />$ 220.00 <br />$ 220.00 <br />$ 790.00 <br />$ 790.00 <br />$ - <br />18 <br />COMMON EXCAVATION (P) (STREET/DRIVEWAY) <br />5,780 <br />CY <br />$ 6.80 <br />$ 39,304.00 <br />$ 10.00 <br />$ 57,800.00 <br />$ - <br />19 <br />COMMON EXCAVATION (P) FOR TRAIL <br />840 <br />CY <br />$ 7.20 <br />$ 6,048.00 <br />$ 10.00 <br />$ 8,400.00 <br />$ - <br />20 <br />SUBGRADE EXCAVATION <br />700 <br />CY <br />$ 7.15 <br />$ 5,005.00 <br />$ 4.00 <br />$ 2,800.00 <br />$ - <br />21 <br />SELECT GRANULAR BORROW (CV) (P) <br />700 <br />CY <br />$ 10.25 <br />$ 7,175.00 <br />$ 15.75 <br />$ 11,025.00 <br />$ - <br />22 <br />TOPSOIL BORROW (LV) <br />2,100 <br />CY <br />$ 10.00 <br />$ 21,000.00 <br />$ 1.00 <br />$ 2,100.00 <br />$ - <br />23 <br />CRUSHED ROCK -6" DEPTH (TRENCH STABILIZATION) <br />100 <br />LF <br />$ 5.00 <br />$ 500.00 <br />$ 15.75 <br />$ 1,575.00 <br />$ - <br />24 <br />EXPLORATORY DIGGING <br />5 <br />HR <br />$ 175.00 <br />$ 875.00 <br />$ 150.00 <br />$ 750.00 <br />$ - <br />25 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) (STREET, <br />DRIVEWAY) <br />6,050 <br />TN <br />$ 15.00 <br />$ 90,750.00 <br />$ 12.60 <br />$ 76,230.00 <br />$ <br />26 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) FOR TRAIL <br />1,123 <br />TN <br />$ 17.85 <br />$ 20,045.55 <br />$ 15.75 <br />$ 17,687.25 <br />* <br />$ - <br />27 <br />TYPE MV AGG. 3 WEARING COURSE ( C.S.A.H. 10, C.S.A.H. 49) <br />1,224 <br />TN <br />$ 38.43 <br />$ 47,038.32 <br />$ 45.00 <br />$ 55,080.00 <br />$ - <br />28 <br />TYPE MV AGG. 3 NON - WEARING COURSE ( C.S.A.H. 10, C.S.A.H. <br />49). <br />1,809 <br />TN <br />$ 38.43 <br />$ 69,519.87 <br />$ 48.80 <br />$ 88,279.20 <br />$ - <br />29 <br />TYPE LV AGG. 3 WEARING COURSE (WARE RD) <br />230 <br />TN <br />$ 42.69 <br />$ 9,818.70 <br />$ 48.50 <br />$ 11,155.00 <br />$ - <br />30 <br />TYPE LV AGG. 3 NON - WEARING COURSE (WARE RD, <br />COMMERCIAL DWYS) <br />253 <br />TN <br />$ 42.69 <br />$ 10,800.57 <br />$ 86.85 <br />$ 21,973.05 <br />$ <br />31 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR TRAIL <br />324 <br />TN <br />$ 44.77 <br />$ 14,505.48 <br />$ 63.25 <br />$ 20,493.00 <br />$ - <br />32 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAY <br />400 <br />SY <br />$ 44.77 <br />$ 17,908.00 <br />$ 13.65 <br />$ 5,460.00 <br />$ <br />33 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />1,100 <br />GAL <br />$ 1.20 <br />$ 1,320.00 <br />$ 1.50 <br />$ 1,650.00 <br />$ - <br />34 <br />CONNECT TO EXISTING STORM SEWER PIPE (ALL SIZES AND <br />TYPES) <br />5 <br />EA <br />$ 950.00 <br />$ 4,750.00 <br />$ 1,400.00 <br />$ 7,000.00 <br />$ <br />35 <br />12" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 690.00 <br />$ 690.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />$ - <br />36 <br />18" RC PIPE APRON W/ TRASH GUARD <br />5 <br />EA <br />$ 800.00 <br />$ 4,000.00 <br />$ 2,300.00 <br />$ 11,500.00 <br />$ - <br />37 <br />12" RC PIPE SEWER CLASS V DESIGN 3006 <br />63 <br />LF <br />$ 32.50 <br />$ 2,047.50 <br />$ 45.00 <br />$ 2,835.00 <br />$ - <br />Page 5 <br />