1. OFFICIAL EXHIBITS AND DEVELOPMENT CONDITIONS. The Subject Property
<br />will be developed, used, and maintained in conformance with the approved development plans,
<br />which are referred to as the "Official Exhibits ", the Ordinance including the Lino Lakes Town
<br />Center Design & Development Guide ", the Resolution, the Redevelopment Contract, the terms
<br />and conditions of this Agreement and applicable grant agreements and all state, county, city and
<br />other governmental regulations which may be applicable thereto. The Official Exhibits
<br />themselves will not be attached to this Agreement. If the Official Exhibits vary from the written
<br />terms of this Agreement, the written terms will control. The Official Exhibits are as follows:
<br />A. Boundary, Topographic and Tree Inventory Survey, prepared by E.G. Rud and
<br />Sons, Inc., received November 10, 2003
<br />B. Preliminary Plat, prepared by E.G. Rud and Sons, Inc., dated June 8, 2004.
<br />C. Master Site Plan, prepared by Hartford Group, Inc., dated February 6, 2004.
<br />D. Master Grading Plan, prepared by Hartford Group, Inc., received November 10,
<br />2003.
<br />E. Master Landscaping Plan, prepared by Hartford Group, Inc., dated February 6,
<br />2004.
<br />F. Sanitary Sewer and Water Plan, dated February 1, 2004
<br />G. Site Grading and Erosion and Control Plan, dated February 1, 2004
<br />H. Storm Sewer Routing Plan, dated February 1, 2004
<br />I. Preliminary Storm Sewer Plan, dated November 25, 2001
<br />J. Existing Drainage Plan and Storm Water Calculations, dated November 25, 2001
<br />K. Preliminary Street Grading Plan, dated February 1, 2004
<br />L. Street Lighting Plan, dated February 1, 2004
<br />M. Preliminary Streetscaping Plan (Areas 1 through 4) , dated November 25, 2001
<br />N. Legacy at Woods Edge Feasibility Study, dated June 10, 2004
<br />2. DEVELOPMENT PLANS.
<br />A. Grading, Drainage & Erosion Control Master Plan. The Developer's Engineer
<br />shall prepare, at the Developer's expense, a final grading, drainage and erosion control
<br />master plan for review and approval by the City. The plan shall include the following:
<br />1. Certified wetland delineation, with maximum two -foot contours and cross
<br />sections as necessary.
<br />2. Identification of all tree preservation areas and methods of protection for
<br />said areas.
<br />3. The plan shall include an erosion control plan, detailing all erosion control
<br />measures to be implemented during construction. The plan shall include a turf
<br />establishment plan which details topsoil placement, seeding, sodding, mulching,
<br />fertilizing and watering.
<br />LegacyDevelopmentContractfinal .doc 3
<br />12/17/04
<br />
|