My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/14/1990 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1990
>
05/14/1990 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2014 12:50:11 PM
Creation date
11/19/2014 9:32:39 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
05/14/1990
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 9 <br />ORDINANCE NO. 03 - 90 <br />street hereafter constructed in the City. <br />Subd. 1. Silt Fence. Silt fence shall be <br />placed as directed or approved by <br />the City Engineer prior to <br />construction to provide for erosion <br />control. Additional silt fence <br />shall be installed during <br />construction as deemed necessary by <br />the City Engineer or Public Works <br />Director to address site conditions. <br />Subd. 2 Clearing & Grubbing. Areas which <br />will be disturbed by street <br />construction shall be stripped of <br />all vegetation, trees and topsoil. <br />Acceptable topsoil may be <br />appropriately stockpiled for reuse. <br />Subd. 3 Utilities. Sanitary sewer, water and <br />storm sewer construction shall be <br />completed prior to or in conjunction <br />with street construction. <br />Subd. 4 Compaction. The subbase and gravel <br />base shall be compacted to a minimum <br />of 100% of standard proctor density. <br />Pavement shall be compacted by the <br />ordinary compaction method. <br />Subd. 5 Connecting to Existing Streets. <br />-Connections to existing paved <br />streets shall require a straight <br />edge cut and tack coat applied prior <br />to paving of the new street. <br />Subd. 6 Bituminous Paving. Successive <br />pavement construction shall be <br />tacked to prior work in accordance <br />with Mn /DOT Specification 2356. <br />Subd. 7 Turf Establishment. Work req!ired <br />for turf establishment shall <br />completed_ during the same <br />construction season in which e <br />streets were rough graded. <br />Subd. 8 Testing. All tests herein rt <br />shall be taken by an accredi'. <br />soils testing laboratory.,;T <br />shall be paid for by the dev <br />on a developer installed; pro, <br />Tests will include but not h- <br />limited to: <br />red <br />
The URL can be used to link to this page
Your browser does not support the video tag.