My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/14/1990 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1990
>
05/14/1990 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2014 12:50:11 PM
Creation date
11/19/2014 9:32:39 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
05/14/1990
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 03 — 90 <br />two tests will be required. <br />302.06 Construction Completion & Warranty <br />Subd. 1. Building Construction Permit. No <br />permit shall be issued for the <br />construction of a new building in a <br />subdivision until the rough grading <br />of the public street providing <br />access thereto has been completed, <br />and where applicable, sewer and <br />water construction in connection <br />therewith has been completed or is <br />under construction. Occupancy <br />permits for residents in a new <br />subdivision shall not be issued <br />until one course of bituminous <br />surfacing is in place. <br />Subd. 2. Partial Maintenance. After a street <br />has been completed to a point where <br />curb and gutter, the base course, <br />and the bituminous binder course are <br />installed and after building permits <br />have been issued for construction of <br />buildings on property fronting on <br />said streets, the street shall be <br />placed on the routine maintenance <br />list of the City. Snow plowing <br />operations will be carried on in the <br />winter time. This shall not in any <br />way constitute final acceptance by <br />the City and such maintenance or _ <br />partial acceptance by the Council <br />shall not have any effect upon <br />agreements existing between the City <br />and the developer for further <br />improvements on such streets. The <br />wearing course shall not be placed <br />until 80% of the housing units in <br />the development are substantially <br />completed. <br />Subd. 3. Sealcoating. Approximately tw. <br />years after the placement of t <br />..2r ng course mixture, a sea? <br />consisting of a CRS emulsifier` <br />asphalt .. ccuiorming to Mn /DOT <br />Specification 3151 applied at e <br />rate of 0.35 gallons per squa yard, <br />and FA -3 aggregate conforming <br />Mn /DOT Specification 3137 app. ' of <br />the rate of 35`:lbs. per squar 3rd._ <br />shall be placed. <br />PAGE 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.