My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-03-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
11-03-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 1:44:15 PM
Creation date
11/24/2014 2:19:52 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/03/2014
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WS — Item #1 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 1 <br />Date: November 3, 2014 <br />To: City Council <br />From: John Swenson, Public Safety Director <br />Re: Preliminary Floor Plans for Fire House at Birch St. & Centerville Rd. <br />Background <br />Following selection of the preferred building site on August 11, 2014, staff has been actively <br />working with the design team to develop a schematic site plan and floor plan that meets the future <br />needs of the Lino Lakes Public Safety Department. Staff had the opportunity to visit other fire <br />facilities and to meet with fire personnel in preparation for programming the new station. <br />During the council work session on October 13th staff and CNH Architects presented Council with <br />3 design options for the new south side fire station. Council provided feedback on the design <br />options for staff and CNH to incorporate in the preliminary design that will be presented tonight <br />for further Council comment. <br />CNH Architects will be present at the meeting to provide an overview of the progress that has been <br />made to this point and to discuss the four primary components of the project, which includes site <br />plan, floor plan, floor image, and cost estimate. <br />Off-site Improvements <br />Staff is also working with WSB and Associates to develop plans for the extension of sanitary sewer <br />and water main, and for turn lane improvements to service the site. Development of this site should <br />also include evaluation and planning for co -location of other municipal services. Co -location <br />provides financial benefit to the community in terms of shared costs. For example, the drive lanes <br />and turn lanes will provide access not only to the fire station but also the future recreation complex. <br />There are also plans for a well, pump house, and water reservoir on the site. Staff is continuing to <br />evaluate placement of a public works facility in this location that would result in long-term savings <br />for the community. <br />Requested Council Direction <br />Staff is requesting council comment on the preliminary plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.