Laserfiche WebLink
of <br />t2 <br />2m <br />5o uJ <br />ca) <br />E c E <br />L2 N <br />o a) N ti <br />> . r a N <br />• J N N Tr C_ <br />C C I Q <br />cJ�T� <br />E >, CD u) N <br />ECU uCflo <br />o 3w's <br />cdo_mwo <br />N - a E <br />0i— <br />o aa) <br />O 0 E <br />▪ c <br />• o <br />o H <br />� O <br />Annual Water Resource Infrastructure Inspection <br />Plan <br />Develop a plan to annually inspect all structural <br />pollution control devices such as trap manholes, <br />grit chambers, sumps, floatable skimmers and <br />traps, separators and other small settling or <br />filtering devices. Also develop a plan for the <br />annual inspection of at least 20% of MS4 outfalls, <br />sediment basins and ponds. Based on the <br />inspections, determine if repair replacement, or <br />maintenance measures are necessary for proper <br />operation and to prevent environmental impacts <br />such as erosion. <br />Ch <br />0 <br />0 <br />N <br />Implement Water Resource Infrastructure Inspection <br />Plan <br />Implement the Plan and Train Employees <br />0 <br />O <br />Infrastructure Repair and Maintenance <br />The necessary repair and maintenance should be <br />completed in the same year as the inspection or, <br />if impracticable, be incorporated into the next <br />year's work plan. Such maintenance should be <br />discussed in the NPDES Phase II General Permit <br />annual report. <br />O <br />0 <br />N <br />Public Parking Lot and Street Sweeping <br />Continue a priority and budgeting system for <br />sweeping public parking lots and streets at least <br />twice a year. <br />M <br />0 <br />0 <br />Privately Constructed Water Resource Infrastructure <br />Performance Plan. <br />Develop or refine standard construction <br />requirements, access standards and maintenance <br />easements, maintenance covenants including <br />inspection, maintenance, repair and sweeping of <br />parking lots and private roads at least twice a year <br />and require reports for inclusion in NPDES Phase <br />II General Permit annual reports. Also develop an <br />inspection program. <br />O <br />0 <br />N <br />Privately Constructed Water Resource Infrastructure <br />Performance Implementation. <br />Train City employees to implement the Plan. <br />0 <br />0 <br />N <br />